Method and device for establishing communication connection

    公开(公告)号:US10609133B2

    公开(公告)日:2020-03-31

    申请号:US15410188

    申请日:2017-01-19

    IPC分类号: H04L29/08 H04L12/24 H04L12/26

    摘要: The present application discloses a method and device for establishing communication connection. An embodiment of the method includes: selecting a predetermined number of servers from a server cluster to form a backup server cluster, the server cluster including at least one server adapted to implement a given service; obtaining communication information of each backup server in the backup server cluster, and selecting a backup server from the backup server cluster as a master server based on the communication information of the backup server; and sending the communication information of the master server to controlled equipment controlled by the server cluster to establish communication connection between the master server and the controlled equipment. The embodiment solves a problem of reliability raised when main server abnormally quits or restarts during the operation of a system.

    MONITORING METHOD AND APPARATUS
    13.
    发明申请

    公开(公告)号:US20180065575A1

    公开(公告)日:2018-03-08

    申请号:US15410451

    申请日:2017-01-19

    摘要: The present application discloses a monitoring method and apparatus. A specific implementation of the method comprises: reading information about monitoring data acquisition methods of monitored objects, the monitoring data acquisition method comprising an active acquisition method and a passive acquisition method; executing following steps for each of the monitored objects having the active acquisition method as the monitoring data acquisition method: generating a monitoring data acquisition task of the monitored object; determining a monitoring data acquisition frequency of the monitored object; and adding the monitoring data acquisition task to to-be-executed monitoring data acquisition task sets in a defined period corresponding to the monitoring data acquisition frequency; executing, in successive defined periods, monitoring data acquisition tasks in the corresponding to-be-executed monitoring data acquisition task sets; and parsing acquired monitoring data of the monitored objects to generate a monitoring result. The implementation solves the problem of high system resource occupation and waste of system resources during the monitoring process.