WORK MACHINE MEASUREMENT SYSTEM, WORK MACHINE, AND MEASURING METHOD FOR WORK MACHINE

    公开(公告)号:US20200058177A1

    公开(公告)日:2020-02-20

    申请号:US16487863

    申请日:2018-07-27

    Applicant: Komatsu Ltd.

    Abstract: A work machine measurement system includes an image acquisition unit that acquires an image of a work target captured, while a swinging body of a work machine is swinging, by an image capturing device mounted on the swinging body, a three-dimensional position calculation unit that calculates a three-dimensional position of the work target based on the image, a swing data acquisition unit that acquires swing data about the swinging body, a determination unit that determines whether or not the swing data satisfies a predefined swinging condition and an output unit that outputs a swinging instruction signal based on a result of the determination by the determination unit.

    CALIBRATION SYSTEM, WORK MACHINE, AND CALIBRATION METHOD

    公开(公告)号:US20170284071A1

    公开(公告)日:2017-10-05

    申请号:US15308453

    申请日:2016-03-29

    Applicant: Komatsu Ltd.

    Abstract: A calibration system includes at least a pair of imaging devices in a work machine having a working unit that image an object; a position detector detecting a position of the working unit; and a processing unit that, by using first position information about a predetermined position of the working unit captured by the imaging devices, second position information about the predetermined position detected by the position detector in an attitude of the working unit taken when the imaging devices image the predetermined position, and third position information about a predetermined position outside the work machine, imaged by the imaging devices, obtains information about a position and an attitude of the imaging devices, and transformation information used for transforming a position of the object imaged by the imaging devices from a first coordinate system to a second coordinate system.

    CONSTRUCTION MANAGEMENT SYSTEM AND CONSTRUCTION MANAGEMENT METHOD

    公开(公告)号:US20250037217A1

    公开(公告)日:2025-01-30

    申请号:US18716206

    申请日:2022-12-07

    Applicant: Komatsu Ltd.

    Abstract: A construction management system includes an image data acquisition unit that acquires image data indicating an image of a construction site where a work machine operates, a terrain data storage unit that stores terrain data indicating a three-dimensional shape of a terrain shape of the construction site, a person specifying unit that specifies a person in the image, a two-dimensional position specifying unit that specifies a two-dimensional position of the person in the image, and a three-dimensional position specifying unit that specifies a three-dimensional position of the person in the construction site based on the two-dimensional position and the terrain data.

    Image processing system, display device, image processing method, method for generating trained model, and dataset for learning

    公开(公告)号:US11414837B2

    公开(公告)日:2022-08-16

    申请号:US17261701

    申请日:2019-07-19

    Applicant: KOMATSU LTD.

    Inventor: Shun Kawamoto

    Abstract: An image processing system includes a data acquisition unit and a position specifying unit. The data acquisition unit acquires a captured image showing a drop target of a work machine in which a transport object is dropped. The position specifying unit specifies a position of a predetermined part of the drop target shown in the captured image based on the captured image and a position specifying model. The position specifying model is a trained model, which outputs a position of a predetermined part of a drop target shown in an image when the image is input. A display device may display information regarding the position of the predetermined part of the drop target of the transport object specified by the image processing system.

Patent Agency Ranking