-
公开(公告)号:US11009860B2
公开(公告)日:2021-05-18
申请号:US16351855
申请日:2019-03-13
Inventor: Hirokazu Takehara , Hiroki Sagara
IPC: G05B19/418
Abstract: A preparation schedule creating method includes: an information acquiring step of acquiring production schedule information including a production sequence, a commenceable time point, and a production deadline time point, member information related to the members, arrangement means information related to a state of arrangement means attached to production equipment and a state of equipment detached arrangement means detached from the production equipment, work quantity information related to a work quantity of arrangement work of arranging members on the arrangement means, worker information related to the number of workers that performs the arrangement work; a usable arrangement means selecting step of selecting a usable arrangement means based on the production schedule information and the arrangement means information; and a preparation work schedule determining step of determining the selected usable arrangement means as the usable arrangement means for one model in the preparation work schedule.
-
公开(公告)号:US10793388B2
公开(公告)日:2020-10-06
申请号:US15705706
申请日:2017-09-15
Inventor: Naofumi Ikuta , Takuya Yamazaki , Hiroki Sagara , Isato Iwata
Abstract: A feeder arrangement support system for supporting an arrangement of a feeder on a feeder arrangement unit includes a imaging unit that images information, a processor that superimposes arrangement support information for supporting the feeder arrangement on the feeder arrangement unit on an image obtained by imaging the feeder arrangement unit or a field of view of a worker, to generate a superimposed composite image, and a display that displays the superimposed composite image.
-
公开(公告)号:US10466685B2
公开(公告)日:2019-11-05
申请号:US14845618
申请日:2015-09-04
Inventor: Isato Iwata , Takuya Yamazaki , Hirokazu Takehara , Hiroki Sagara
IPC: G05B19/418
Abstract: In a production management method of a substrate in a component mounting system having plural component mounting lines configured to include plural component mounting apparatuses, reading production data of an interrupt type substrate; collecting equipment data of each of the component mounting lines; and determining at least one component mounting line to produce the interrupt type substrate based on the read production data of the interrupt type substrate and the collected equipment data of each of the component mounting lines are performed.
-
-