-
公开(公告)号:US20160231727A1
公开(公告)日:2016-08-11
申请号:US14881917
申请日:2015-10-13
Inventor: Hiroki Sagara
IPC: G05B19/402 , G05B15/02
CPC classification number: H05K13/0857 , G05B2219/36262 , G05B2219/50386
Abstract: Information about allocation states of parts feeders in a component feeding portion which is currently attached to a component mounting apparatus and information about allocation states of the parts feeders in a component feeding portion which has been detached from the component mounting apparatus are acquired. Work instruction information is derived. The work instruction information defines required setup change work so that allocation states of parts feeders in one of component feeding portions are changed over from allocation states to first allocation states corresponding to a first product type. The derived work instruction information is displayed on a display screen. The work instruction information includes a plurality of unit work information pieces. The plurality of unit work information pieces are displayed on the display screen so that the unit work information pieces are arranged in accordance with a work sequence order.
Abstract translation: 获取关于当前附接到部件安装装置的部件供给部中的部件供给部的分配状态的信息,以及关于从部件安装装置脱离的部件供给部中的部件供给部的分配状态的信息。 导出工作指导信息。 工作指令信息定义所需的设置改变工作,使得部件馈送部分之一中的部件馈送器的分配状态从分配状态切换到对应于第一产品类型的第一分配状态。 导出的工作指令信息显示在显示屏幕上。 工作指示信息包括多个单位作业信息。 多个单位作业信息被显示在显示画面上,使得根据作业顺序排列单位作业信息。
-
2.
公开(公告)号:US12137525B2
公开(公告)日:2024-11-05
申请号:US17622906
申请日:2020-05-28
Inventor: Hisashi Maezono , Hiroki Sagara
IPC: H05K13/04 , G05B19/418 , H05K13/02
Abstract: A setup change work support method includes a feeder information acquisition step, a production information acquisition step, and a target feeder determination step. The feeder information acquisition step acquires information on the capability of a feeder that can be disposed in a component supply unit of an electronic component mounting device for mounting an electronic component on a workpiece and that supplies the electronic component. The production information acquisition step acquires information on the production of the workpiece. The target feeder determination step determines a target feeder that is disposed in the component supply unit and is used to produce a target type based on information on the capability of the feeder and information on the production of the workpiece.
-
公开(公告)号:US10775775B2
公开(公告)日:2020-09-15
申请号:US16106224
申请日:2018-08-21
Inventor: Isato Iwata , Takuya Yamazaki , Naofumi Ikuta , Hiroki Sagara
IPC: G05B19/418
Abstract: A production system includes a production line for producing a product by connecting a plurality of production facilities having working units for doing work on a transported workpiece; a gap time calculator that calculates a plurality of gap times respectively corresponding to the plurality of the production facilities until a next workpiece is transported from an upstream production facility to each of the plurality of the production facilities based on a production status of each of the plurality of the production facilities; and a preparation operation determination unit that determines an automatic preparation operation capable of being executed in each of the plurality of the production facilities based on the plurality of the gap times. Each of the plurality of the production facilities executes the determined automatic preparation operation.
-
公开(公告)号:US10149420B2
公开(公告)日:2018-12-04
申请号:US14794368
申请日:2015-07-08
Inventor: Isato Iwata , Hirokazu Takehara , Takuya Yamazaki , Hiroki Sagara
IPC: H05K13/08
Abstract: A component mounting method is provided in a component mounting apparatus that mounts a component onto a board using a plurality of pieces of production data linked to component data. The method includes executing, when the component data is changed, a simulation of a production cycle time based on the production data, and comparing a simulation result of the production cycle time after change of the component data with a production cycle time or a simulation result of the production cycle time before change of the component data, and outputting a comparison result.
-
公开(公告)号:US09997502B2
公开(公告)日:2018-06-12
申请号:US14799766
申请日:2015-07-15
Inventor: Hiroki Sagara , Takuya Yamazaki , Hirokazu Takehara , Isato Iwata
IPC: H05K3/00 , H01L25/10 , G05B19/418
CPC classification number: H01L25/10 , G05B19/41805 , G05B2219/36195 , Y02P90/04 , Y02P90/20
Abstract: There is provided a component arrangement determination method, in a component mounting apparatus including a plurality of component supply units for supplying components, for determining arrangement of the component supply units used for production of a plurality of types of component mounted boards. The method includes specifying a production frequency of each of the plurality of types of component mounted boards for a predetermined period of time, grouping the plurality of types of component mounted boards into a plurality of groups capable of being produced without changing the arrangement of the component supply units based on the production frequency, and determining arrangement, in the component mounting apparatus, of the component supply units for supplying components necessary for production of types of component mounted boards that belong to each group of the plurality of groups.
-
公开(公告)号:US11048242B2
公开(公告)日:2021-06-29
申请号:US16351864
申请日:2019-03-13
Inventor: Hiroki Sagara , Hirokazu Takehara
IPC: G05B19/418
Abstract: A production schedule creating method includes: a schedule information acquiring step of acquiring production schedule information including a production sequence for producing a plurality of models of products, a commenceable time point, and a production deadline time point; a preparation time calculating step of calculating a preparation time taken for arrangement work of arranging members on arrangement means, for each of a plurality of models; a production time point calculating step of calculating a production commencing time point and a production end time point for each of the plurality of models; a schedule satisfaction determining step of determining whether or not a schedule satisfying condition is satisfied, for each of the plurality of models; and a sequence changing step of changing a sequence for producing an unsatisfied model that does not satisfy the schedule satisfying condition, in a case where the unsatisfied model is present.
-
公开(公告)号:US09918391B2
公开(公告)日:2018-03-13
申请号:US14439912
申请日:2013-11-01
Inventor: Takuya Yamazaki , Hiroki Sagara , Hirokazu Takehara
CPC classification number: H05K3/303 , H05K13/08 , H05K13/083 , H05K2203/0195 , H05K2203/16
Abstract: An electronic component mounting system includes a component information change history storage unit that stores component information including operating parameters for numerical determination of an operation mode of an electronic component mounting operation unit and a change history of the component information, a mounting error recorder that detects a mounting error occurring during an electronic component mounting operation and records mounting error information relating to an occurrence situation of the mounting error, and a display unit that displays a transition of the mounting error. When the component information is changed, the display unit displays the past mounting error information in which the mounting error information relating to the mounting error occurring during the electronic component mounting operation for the electronic component as changed is associated with the past component information immediately before the change is stored in the past mounting error storage unit on a display screen.
-
公开(公告)号:US09918390B2
公开(公告)日:2018-03-13
申请号:US14439403
申请日:2013-11-01
Inventor: Takuya Yamazaki , Hiroki Sagara , Hirokazu Takehara
CPC classification number: H05K3/303 , B25J9/1674 , B25J9/1687 , B25J9/1694 , H05K13/08 , H05K13/083 , Y10S901/44 , Y10T29/53174
Abstract: An electronic component mounting system includes a component information change history storage unit that stores component information including operating parameters for numerical determination of an operation mode of an electronic component mounting operation unit and a change history of the component information, a mounting error recorder that detects a mounting error occurring during an electronic component mounting operation and records mounting error information relating to an occurrence situation of the mounting error, and a display unit that displays a transition of the mounting error on a screen of the display unit and reads past component information for designated date and time based on the designated date and time so that a correlation between change in the component information and the mounting error can be checked with ease and the component information including the operating parameter can be restored to a proper state.
-
公开(公告)号:US11170326B2
公开(公告)日:2021-11-09
申请号:US16351842
申请日:2019-03-13
Inventor: Hirokazu Takehara , Hiroki Sagara
IPC: G06Q10/06
Abstract: A schedule managing method includes: a number-of-worker inputting step of inputting the number of workers who perform arrangement work of arranging the members to arrangement means, in association with a production time point for producing products; a preparation time point changing step of changing a start time point or an end time point of the arrangement work in a preparation work schedule based on a work quantity of the arrangement work and the number of workers; a production time point changing step of changing a start time point or an end time point of production of the products in a production schedule based on a start time point or an end time point of the changed arrangement work; and a displaying step of displaying the production schedule, the preparation work schedule, and the number of workers along the production time point.
-
公开(公告)号:US11048241B2
公开(公告)日:2021-06-29
申请号:US16351845
申请日:2019-03-13
Inventor: Hirokazu Takehara , Hiroki Sagara
IPC: G05B19/418
Abstract: A production schedule creating method includes: acquiring production sequence information including a production sequence for producing a plurality of models of products and preparation work sequence information including a sequence of arrangement work of arranging members corresponding to the plurality of models on arrangement means which is attached to production equipment so as to arrange the members that are used for production of the products; acquiring arrangement means information including production arrangement means information that is information of the arrangement means attached to the production equipment and equipment detached arrangement means information that is information of an equipment detached arrangement means that is not attached to the production equipment; optimizing a production schedule obtained after a time point of acquisition of the arrangement means information, based on the production sequence information, the preparation work sequence information, and the arrangement means information.
-
-
-
-
-
-
-
-
-