-
公开(公告)号:US20190264095A1
公开(公告)日:2019-08-29
申请号:US16310753
申请日:2017-06-15
Applicant: SCHLUMBERGER TECHNOLOGY CORPORATION
Inventor: Meng Qu , Francois M. Auzerais , Sandeep Verma , Agathe Robisson , Sharath Chandra Mahavadi , Yucun Lou , Shitong S. Zhu
IPC: C09K8/66 , C09K8/60 , C09K8/70 , E21B33/138 , E21B43/26 , E21B43/267
Abstract: Methods of treating a subterranean formation penetrated by a wellbore may include injecting a multistage fracturing treatment into the wellbore comprising one or more stages of geopolymer precursor composition containing a geopolymer precursor and an activator, and one or more stages of a spacer fluid; and curing the one or more stages of geopolymer precursor composition. In another aspect, methods of treating a subterranean formation penetrated by a wellbore may include injecting a multistage fracturing treatment into the wellbore that include one or more stages of geopolymer precursor composition, wherein the geopolymer precursor composition includes an emulsion having an oleaginous external phase, and an internal phase comprising one or more surfactants, a geopolymer precursor, and an activator, and one or more stages of a spacer fluid; and curing the one or more stages of geopolymer precursor composition.
-
公开(公告)号:US20180298271A1
公开(公告)日:2018-10-18
申请号:US15766473
申请日:2016-07-26
Applicant: SCHLUMBERGER TECHNOLOGY CORPORATION
Inventor: Francois Auzerais , Meng QU , Shitong S. Zhu , Agathe Robisson , Yucun Lou , Syed Afaq Ali , Bruce Alexander Mackay , Sandeep Verma , Sharath Chandra Mahavadi
IPC: C09K8/68 , C09K8/60 , C09K8/80 , C09K8/70 , E21B43/267
Abstract: Methods include introducing a multistage treatment fluid into one or more intervals of a wellbore, wherein the treatment fluid contains one or more stages of a polymer-forming composition and one or more stages of a spacer fluid and initiating polymerization of the one or more stages of polymer-forming composition. Methods may include designing a multistage treatment fluid containing one or more stages of a polymer-forming composition and one or more stages of a spacer fluid, wherein or more stages of the polymer-forming composition comprises a thermosetting polymer; and pumping the multistage treatment fluid into a wellbore, wherein the pumping rate is determined by constructing a model based upon (a) the minimum pumping rate determined from the critical reaction temperature and the downhole temperature, (b) the fracture closing time, (c) the temperature within one or more fractures, and (d) the maximum pumping rate.
-