METHOD FOR TRANSMITTING OF A MULTI-CHANNEL DATA STREAM ON A MULTI-TRANSPORT TUNNEL, CORRESPONDING COMPUTER-READABLE STORAGE MEANS AND TUNNEL END-POINTS
    31.
    发明申请
    METHOD FOR TRANSMITTING OF A MULTI-CHANNEL DATA STREAM ON A MULTI-TRANSPORT TUNNEL, CORRESPONDING COMPUTER-READABLE STORAGE MEANS AND TUNNEL END-POINTS 有权
    多通道数据流在多运输隧道上的传输方法,相应的计算机可读存储装置和隧道端点

    公开(公告)号:US20100161824A1

    公开(公告)日:2010-06-24

    申请号:US12636680

    申请日:2009-12-11

    CPC classification number: H04L12/4633 H04L12/2832

    Abstract: A method is proposed for transmitting a multi-channel data stream comprising frames comprising a plurality of channels, the transmitting being done through a multi-transport tunnel from a first tunnel end-point to a second tunnel end-point, the multi-transport tunnel implementing a first carrier supporting a transport protocol with acknowledgement and a second carrier supporting a transport protocol without acknowledgement.The invention aims more specifically at averting or limiting the phenomena of interruptions in the rendering of a multi-channel stream in transit on a tunnel, and more particularly at providing a transport technique enabling regular and uninterrupted delivery of the multi-channel stream while at the same time reducing the memory resources needed at reception.

    Abstract translation: 提出了一种用于发送包括多个信道的帧的多信道数据流的方法,所述发送通过多传输隧道从第一隧道端点到第二隧道端点完成,所述多传输隧道 实现支持具有确认的传输协议的第一载波和支持传输协议而没有确认的第二载波。 本发明更具体地旨在避免或限制在隧道中传输中的多信道流的呈现中断的现象,更具体地,提供一种传输技术,其能够在多信道流的定期和不间断传送的同时 同时减少接收所需的内存资源。

    METHOD FOR MANAGING A TRANSMISSION OF DATA STREAMS ON A TRANSPORT CHANNEL OF A TUNNEL, CORRESPONDING TUNNEL END-POINT AND COMPUTER-READABLE STORAGE MEDIUM
    32.
    发明申请
    METHOD FOR MANAGING A TRANSMISSION OF DATA STREAMS ON A TRANSPORT CHANNEL OF A TUNNEL, CORRESPONDING TUNNEL END-POINT AND COMPUTER-READABLE STORAGE MEDIUM 有权
    管理运输隧道数据流传输的方法,相应的隧道端点和计算机可读存储介质

    公开(公告)号:US20100008245A1

    公开(公告)日:2010-01-14

    申请号:US12488402

    申请日:2009-06-19

    CPC classification number: H04L47/10 H04L47/193

    Abstract: A method is proposed for managing a transmission of data streams on a transport channel of a tunnel, the transmission of each stream being performed on the transport channel according to a transport protocol scheduled by packets and with acknowledgment, the tunnel being implemented between a first and a second tunnel end-point connected respectively to a first and a second sub-network, each stream being transmitted from a sender device to a receiver device, one device among the sender device and the receiver device being connected to the first sub-network and the other to the second sub-network. The method is performed by the first tunnel end-point and comprises the following steps: detecting a loss of packet on the transport channel of the tunnel; identifying at least one stream having at least one packet blocked on the transport channel of the tunnel by the loss; for at least one identified stream, generating and transmitting at least one acknowledgment to the sender device that has transmitted, on the tunnel, a packet blocked by said loss.

    Abstract translation: 提出了一种用于管理隧道传输信道上的数据流传输的方法,根据由分组调度并具有确认的传输协议在传输信道上执行每个流的传输,该隧道在第一和第 分别连接到第一子网络和第二子网络的第二隧道端点,每个流从发送器设备发送到接收器设备,所述发送器设备和所述接收器设备中的一个设备连接到所述第一子网络,以及 另一个到第二个子网络。 该方法由第一隧道终点执行,包括以下步骤:检测隧道传输信道上的报文丢失; 识别具有至少一个分组的至少一个流,所述至少一个分组在所述隧道的传输信道上被所述丢失阻塞; 对于至少一个所识别的流,生成并向所述发送器设备发送至少一个确认,所述发送者设备在所述隧道上发送了被所述丢失阻止的分组。

Patent Agency Ranking