-
公开(公告)号:US09562353B2
公开(公告)日:2017-02-07
申请号:US14611272
申请日:2015-02-01
IPC分类号: E04B7/18 , E04D13/04 , E04D13/00 , E04H1/00 , E04B1/94 , E04B1/92 , E03B1/04 , E04B1/12 , E04B1/343
CPC分类号: E04B7/18 , E03B1/04 , E04B1/12 , E04B1/34321 , E04B1/941 , E04B2001/949 , E04D13/00 , E04D13/0477 , E04H1/005 , Y10T137/0318 , Y10T137/6969 , Y10T137/698
摘要: Buildings which include rudimentary plumbing can be transported as a set of disassembled modular parts and then assembled on site. The assembled building includes a water reservoir in the roof and a sewage reservoir in the base, so as to enable gravity-based water supply and sewage disposal in the absence of traditional plumbing and sewage infrastructure. Building envelope elements having internal reservoirs, and methods for constructing such building envelope elements are also described.
摘要翻译: 包括基本管道的建筑物可以作为一组拆卸的模块化部件运输,然后在现场组装。 组装的建筑物包括屋顶的蓄水池和基地的污水池,以便在没有传统的管道和污水基础设施的情况下使基于重力的供水和污水处理。 还描述了具有内部储存器的建筑物包围元件以及用于构造这种建筑物包围元件的方法。
-
公开(公告)号:US09353534B2
公开(公告)日:2016-05-31
申请号:US13958319
申请日:2013-08-02
申请人: JPCM LLC
发明人: Jim Peterson , Craig MacRae
CPC分类号: E04F17/00 , E04D13/0477
摘要: A deck drainage system includes a first bracket. The first bracket has an elongate axis and a transverse axis substantially transverse to the elongate axis. A leg extends along the transverse axis. A first arm extends from the bracket, as does a second arm, where the second arm is substantially parallel to the first arm.
摘要翻译: 甲板排水系统包括第一支架。 第一支架具有基本上横向于细长轴线的细长轴线和横向轴线。 腿沿横轴延伸。 第一臂从支架延伸,与第二臂一样,第二臂基本上平行于第一臂。
-
公开(公告)号:US20160069092A1
公开(公告)日:2016-03-10
申请号:US14940378
申请日:2015-11-13
发明人: Heath Harold Bowman
CPC分类号: E04B1/003 , E04D13/0477 , E04D13/0481 , E04F15/02183 , E04F17/00
摘要: Disclosed are various embodiments of deck drainage systems. In some embodiments, the deck drainage system includes a hanger. The hanger can include a first arm and a second arm. A fastener is configured to be inserted into an opening formed in the first arm. The second arm extends from the first arm, and the second arm forms a slot for an end section of a floor panel.
摘要翻译: 公开了甲板排水系统的各种实施例。 在一些实施例中,甲板排水系统包括衣架。 衣架可以包括第一臂和第二臂。 紧固件被构造成插入形成在第一臂中的开口中。 第二臂从第一臂延伸,并且第二臂形成用于地板镶板端部的槽。
-
公开(公告)号:US08973313B2
公开(公告)日:2015-03-10
申请号:US13581644
申请日:2011-03-04
CPC分类号: E04B7/18 , E03B1/04 , E04B1/12 , E04B1/34321 , E04B1/941 , E04B2001/949 , E04D13/00 , E04D13/0477 , E04H1/005 , Y10T137/0318 , Y10T137/6969 , Y10T137/698
摘要: Buildings which include rudimentary plumbing can be transported as a set of disassembled modular parts and then assembled on site. The assembled building includes a water reservoir in the roof and a sewage reservoir in the base, so as to enable gravity-based water supply and sewage disposal in the absence of traditional plumbing and sewage infrastructure. Building envelope elements having internal reservoirs, and methods for constructing such building envelope elements are also described.
摘要翻译: 包括基本管道的建筑物可以作为一组拆卸的模块化部件运输,然后在现场组装。 组装的建筑物包括屋顶的蓄水池和基地的污水池,以便在没有传统的管道和污水基础设施的情况下使基于重力的供水和污水处理。 还描述了具有内部储存器的建筑物包围元件以及用于构造这种建筑物包围元件的方法。
-
公开(公告)号:US20150033650A1
公开(公告)日:2015-02-05
申请号:US13958319
申请日:2013-08-02
申请人: JPCM LLC
发明人: Jim Peterson , Craig MacRae
IPC分类号: E04B5/02
CPC分类号: E04F17/00 , E04D13/0477
摘要: A deck drainage system includes a first bracket. The first bracket has an elongate axis and a transverse axis substantially transverse to the elongate axis. A leg extends along the transverse axis. A first arm extends from the bracket, as does a second arm, where the second arm is substantially parallel to the first arm.
摘要翻译: 甲板排水系统包括第一支架。 第一支架具有基本上横向于细长轴线的细长轴线和横向轴线。 腿沿横轴延伸。 第一臂从支架延伸,与第二臂一样,第二臂基本上平行于第一臂。
-
公开(公告)号:US07950201B1
公开(公告)日:2011-05-31
申请号:US12498435
申请日:2009-07-07
CPC分类号: E04D13/0477 , E04F17/00
摘要: Drainage under a deck can be performed by a structure that includes hanging components and corrugated panels. For example, a hanging component can have connected first and second portions, with the first portion being connected to hang from one of the joists and extending downward to where it connects to the second portion, which is below the joist. The second portion can be connected to support of at least one of the panels from above. The upper surfaces of panels are sloped so that drainage occurs from a high part to a low part. The direction of slope and the direction of corrugations are not perpendicular, and can be approximately the same. The hanging components can, for example, be L-shaped brackets, U-shaped, or inverted T-shaped, and can be integrally formed by extrusion of plastic or can be metal. The panels can be corrugated plastic or metal sheets.
摘要翻译: 甲板下的排水可以由包括悬挂部件和波纹板的结构进行。 例如,悬挂部件可以具有连接的第一和第二部分,其中第一部分被连接以从托梁之一悬挂并向下延伸到其连接到托梁下方的第二部分的位置。 第二部分可以从上方连接到至少一个面板的支撑件。 板的上表面是倾斜的,使得排水从高部分到低部分发生。 坡度方向和波纹方向不垂直,大致相同。 悬挂部件例如可以是L形托架,U形或倒T形,并且可以通过塑料的挤出而一体地形成,或者可以是金属。 面板可以是波纹塑料或金属板。
-
公开(公告)号:US20110067350A1
公开(公告)日:2011-03-24
申请号:US12956119
申请日:2010-11-30
CPC分类号: E04D13/0477 , E04F17/00
摘要: Drainage under a deck can be performed by a structure that includes hanging components and corrugated panels. For example, a hanging component can have connected first and second portions, with the first portion being connected to hang from one of the joists and extending downward to where it connects to the second portion, which is below the joist. The second portion can be connected to support of at least one of the panels from above. The upper surfaces of panels are sloped so that drainage occurs from a high part to a low part. The direction of slope and the direction of corrugations are not perpendicular, and can be approximately the same. The hanging components can, for example, be L-shaped brackets, U-shaped, or inverted T-shaped, and can be integrally formed by extrusion of plastic or can be metal. The panels can be corrugated plastic or metal sheets.
摘要翻译: 甲板下的排水可以由包括悬挂部件和波纹板的结构进行。 例如,悬挂部件可以具有连接的第一和第二部分,其中第一部分被连接以从托梁之一悬挂并向下延伸到其连接到托梁下方的第二部分的位置。 第二部分可以从上方连接到至少一个面板的支撑件。 板的上表面是倾斜的,使得排水从高部分到低部分发生。 坡度方向和波纹方向不垂直,大致相同。 悬挂部件例如可以是L形托架,U形或倒T形,并且可以通过塑料的挤出而一体地形成,或者可以是金属。 面板可以是波纹塑料或金属板。
-
公开(公告)号:US07584580B1
公开(公告)日:2009-09-08
申请号:US11412159
申请日:2006-04-26
CPC分类号: E04D13/0477 , E04F17/00
摘要: Drainage under a deck can be performed by a structure that includes hanging components and corrugated panels. For example, a hanging component can have connected first and second portions, with the first portion being connected to hang from one of the joists and extending downward to where it connects to the second portion, which is below the joist. The second portion can be connected to support of at least one of the panels from above. The upper surfaces of panels are sloped so that drainage occurs from a high part to a low part. The direction of slope and the direction of corrugations are not perpendicular, and can be approximately the same. The hanging components can, for example, be L-shaped brackets, U-shaped, or inverted T-shaped, and can be integrally formed by extrusion of plastic or can be metal. The panels can be corrugated plastic or metal sheets.
摘要翻译: 甲板下的排水可以由包括悬挂部件和波纹板的结构进行。 例如,悬挂部件可以具有连接的第一和第二部分,其中第一部分被连接以从托梁之一悬挂并向下延伸到其连接到托梁下方的第二部分的位置。 第二部分可以从上方连接到至少一个面板的支撑件。 板的上表面是倾斜的,使得排水从高部分到低部分发生。 坡度方向和波纹方向不垂直,大致相同。 悬挂部件例如可以是L形托架,U形或倒T形,并且可以通过塑料的挤出而一体地形成,或者可以是金属。 面板可以是波纹塑料或金属板。
-
公开(公告)号:US20090188172A1
公开(公告)日:2009-07-30
申请号:US12205435
申请日:2008-09-05
IPC分类号: E04D13/00
CPC分类号: E04D13/0477 , E04D11/00
摘要: A roof system designed to retain water during storms and release it slowly over a period of time includes a polymeric water impervious membrane covered with a drainage board in turn covered with a water retention mat. The water retention mat and drainage board are held in position by ballast, preferably gravel. The mat is designed to retain at least about 25% of a one-inch per hour rainfall and release it gradually over 2 to 3 hours, thereby reducing rain runoff during storms and reducing the load on a storm sewer system
摘要翻译: 设计用于在风暴期间保持水并在一段时间内缓慢释放的屋顶系统包括覆盖有排水板的聚合物防水膜,然后覆盖有保水垫。 保水垫和排水板通过压载物,优选砂砾保持在适当的位置。 该垫被设计成保持至少约25%的1英寸每小时降雨量并逐渐释放2至3小时,从而减少风暴期间的雨水径流,并减少暴雨下水道系统的负荷
-
公开(公告)号:US20070214737A1
公开(公告)日:2007-09-20
申请号:US11803647
申请日:2007-05-14
申请人: Robert Hauck
发明人: Robert Hauck
IPC分类号: E04B1/70
CPC分类号: E04D13/0445 , E04D13/0477 , E04F15/10 , E04F17/00 , E04F2015/0205 , E04F2015/02094 , E04F2201/0511 , E04F2203/04
摘要: A deck with an integrated gutter system includes at least two separated joists and a plurality of planks. Each plank includes longitudinal grooves, is disposed above and supported by the joists, has an undersurface which is juxtaposed with the joists, and is secured to the joists. The deck also includes a plurality of unitary channels. Each channel includes a pair of flanges which mate with longitudinal grooves of immediately adjacent planks. The mating of the flanges of the channel with the grooves of the planks provides the deck with an impervious gutter that extends between and along the two planks, and is located above the joists to which the planks are secured.
-
-
-
-
-
-
-
-
-