-
公开(公告)号:US08437924B2
公开(公告)日:2013-05-07
申请号:US13316894
申请日:2011-12-12
Applicant: Johny Greiner , Yang Liu , Bhavin Vyas
Inventor: Johny Greiner , Yang Liu , Bhavin Vyas
Abstract: A method for managing haul routes in work environments comprises collecting performance data associated with a machine operating in a work environment. The method also includes determining a drive axle torque of the machine and estimating a total effective grade associated with the machine based on the drive axle torque. The estimated total effective grade is compared with a threshold level and, if the estimated total effective grade exceeds the threshold level, a design performance of the machine may be simulated based on the calculated total effective grade. Design performance data is compared with the collected performance data, and a payload limit of the machine is adjusted if the design performance is inconsistent with collected performance data.
-
公开(公告)号:US20070100775A1
公开(公告)日:2007-05-03
申请号:US11261565
申请日:2005-10-31
Applicant: Bhavin Vyas
Inventor: Bhavin Vyas
IPC: G06F17/00
CPC classification number: G06Q99/00 , G06Q30/0283
Abstract: A computer system for estimating the cost of a future project is disclosed. The computer system has a console, at least one input device, and a central processing unit in communication with the console and the at least one input device. The central processing unit is configured to receive one or more parameters of a future project via the at least one input device and determine an equipment solution that satisfies the parameters of the future project. The central processing unit is also configured to analyze historic data automatically collected by equipment encompassed by the equipment solution and estimate a cost of implementing the equipment solution to complete the future project, based on the analysis. The central processing unit is further configured to calculate the cost of the future project based on the estimated cost of implementing the equipment solution.
Abstract translation: 公开了一种用于估计未来项目成本的计算机系统。 计算机系统具有控制台,至少一个输入设备和与控制台和至少一个输入设备通信的中央处理单元。 中央处理单元经配置以通过至少一个输入设备接收未来项目的一个或多个参数,并确定满足未来项目参数的设备解决方案。 中央处理单元还被配置为分析由设备解决方案包含的设备自动收集的历史数据,并根据分析估算实施设备解决方案以完成未来项目的成本。 中央处理单元还被配置为基于实施设备解决方案的估计成本来计算未来项目的成本。
-
3.
公开(公告)号:US20070078692A1
公开(公告)日:2007-04-05
申请号:US11239333
申请日:2005-09-30
Applicant: Bhavin Vyas
Inventor: Bhavin Vyas
IPC: G06F17/50
CPC classification number: G06F17/5009 , G06Q10/06375 , G06Q30/06
Abstract: A method for determining an outcome of a business decision. The method may include creating a hierarchical map of a business and generating a computer simulation of the business based on the hierarchical map. The method may also include identifying an action and using the computer simulation to determine an effect that the action has on the business. The method may further include conveying the effect to a customer.
Abstract translation: 一种确定业务决策结果的方法。 该方法可以包括创建业务的分层映射并且基于分层映射生成业务的计算机模拟。 该方法还可以包括识别动作并使用计算机模拟来确定动作对业务的影响。 该方法还可以包括将效果传达给顾客。
-
公开(公告)号:US08412421B2
公开(公告)日:2013-04-02
申请号:US13316926
申请日:2011-12-12
Applicant: Jonny Greiner , Yang Liu , Bhavin Vyas
Inventor: Jonny Greiner , Yang Liu , Bhavin Vyas
CPC classification number: G06Q50/02 , G06Q10/047 , G06Q10/06 , G06Q10/06316 , G06Q10/0639 , G06Q50/08 , G06Q50/30 , Y02P90/84
Abstract: A method for managing haul routes in work environments comprises receiving performance criteria associated with a haul route and establishing a target total effective grade for at least one machine associated with the haul route based on the performance criteria. The method also includes collecting performance data associated with the at least one machine. A drive axle torque of the at least one machine is determined and an actual total effective grade associated with the at least one machine is estimated. The at least one machine is identified as an underperforming machine if the actual total effective grade for the at least one machine exceeds the target total effective grade. An average total effective grade for the at least one machine is determined as a function of the actual total effective grade. A haul route deficiency is identified if the average total effective grade exceeds a threshold level.
-
公开(公告)号:US20070150295A1
公开(公告)日:2007-06-28
申请号:US11315500
申请日:2005-12-23
Applicant: Jay Dawson , Bhavin Vyas , Dennis Skarvan
Inventor: Jay Dawson , Bhavin Vyas , Dennis Skarvan
IPC: G06Q99/00
CPC classification number: G06Q40/02 , G06Q30/0645 , G06Q40/00
Abstract: An asset management system is provided. The system may include one or more data collection devices configured to monitor one or more operating conditions of a leased machine. At least one of the one or more data collection devices may be configured to directly monitor operation of at least one component of the machine to determine the harshness with which the machine is operated. The system may also include a processor configured to receive data from the one or more data collection devices. The processor may also be configured to determine a value of the machine based on the data from the one or more data collection devices. The processor may be further configured to determine fees associated with the lease in real time based on the data from the one or more data collection devices.
Abstract translation: 提供资产管理系统。 系统可以包括被配置为监视租赁机器的一个或多个操作条件的一个或多个数据收集装置。 一个或多个数据收集装置中的至少一个可以被配置为直接监视机器的至少一个部件的操作,以确定机器操作的粗糙度。 该系统还可以包括被配置为从一个或多个数据收集装置接收数据的处理器。 处理器还可以被配置为基于来自一个或多个数据收集装置的数据来确定机器的值。 处理器还可以被配置为基于来自一个或多个数据收集设备的数据来实时地确定与租赁相关联的费用。
-
公开(公告)号:US20070124000A1
公开(公告)日:2007-05-31
申请号:US11289309
申请日:2005-11-30
Applicant: Eric Moughler , Keith Turcot , Bhavin Vyas
Inventor: Eric Moughler , Keith Turcot , Bhavin Vyas
IPC: G05B15/02
CPC classification number: G06Q10/103 , G05B19/0426 , G05B2219/23297
Abstract: Systems and methods are disclosed for project-oriented job-site management. According to one embodiment, a system is disclosed for managing a project environment including a work machine performing operations associated with a project included in the project environment. The system may include a project management system configured to store a first set of project specifications for the project in a storage device, receive operation data from the work machine reflecting the operations of the work machine, analyze the operation data to determine the status of the work machine, and generate a second set of project specifications based on the status of the work machine. The system may also include a project subscriber configured to receive the second set of project specifications from the project management system and determine an action to be taken with the work machine based on the status of the work machine. The project management system provides a command to the work machine for adjusting the operations of the work machine associated with the project based on the second set of project specifications and the determined action.
Abstract translation: 披露了面向项目的工作现场管理的系统和方法。 根据一个实施例,公开了一种用于管理项目环境的系统,包括执行与包括在项目环境中的项目相关联的操作的作业机器。 该系统可以包括:项目管理系统,被配置为将项目的第一组项目规格存储在存储装置中,从工作机器接收反映作业机器的操作的操作数据,分析操作数据以确定 并根据工作机的状态生成第二组项目规格。 系统还可以包括被配置为从项目管理系统接收第二组项目规范的项目订户,并且基于工作机的状态确定要与作业机器一起采取的动作。 项目管理系统根据第二组项目规范和确定的动作,向作业机构提供调整与项目相关的作业机械的操作的命令。
-
公开(公告)号:US20070078791A1
公开(公告)日:2007-04-05
申请号:US11239243
申请日:2005-09-30
Applicant: Bhavin Vyas , Jay Dawson
Inventor: Bhavin Vyas , Jay Dawson
IPC: G06F17/00
CPC classification number: G05B23/0283 , G06Q30/0283
Abstract: An asset management system is provided. The system may include one or more data collection devices configured to monitor one or more operating conditions of a work machine. The system may also include a processor configured to receive data from the one or more data collection devices and predict a cost to maintain the work machine in the future based on the data from the one or more data collection devices. The processor may also be configured to compare the predicted cost to maintain the work machine to a depreciated value of the work machine to determine a time for replacement of the work machine.
Abstract translation: 提供资产管理系统。 系统可以包括被配置为监视作业机器的一个或多个操作条件的一个或多个数据收集装置。 系统还可以包括处理器,其被配置为从一个或多个数据收集设备接收数据,并且基于来自一个或多个数据收集设备的数据来预测将来维护作业机器的成本。 处理器还可以被配置为将预计成本进行比较,以将作业机器维持在工作机器的折旧值,以确定更换作业机器的时间。
-
公开(公告)号:US20070038532A1
公开(公告)日:2007-02-15
申请号:US11201137
申请日:2005-08-11
Applicant: Bhavin Vyas
Inventor: Bhavin Vyas
IPC: G06F17/00
CPC classification number: G06Q10/06 , G06Q10/087
Abstract: A method for managing a plurality of machines may include producing a service recommendation based on status information related to the machines, and automatically generating an electronic service order for the service recommendation. The method may also include sending the electronic service order to an entity to fulfill the electronic service order.
Abstract translation: 用于管理多个机器的方法可以包括基于与机器相关的状态信息产生服务推荐,并且自动生成用于服务推荐的电子服务订单。 该方法还可以包括向实体发送电子服务订单以实现电子服务订单。
-
-
-
-
-
-
-