-
公开(公告)号:US20130042754A1
公开(公告)日:2013-02-21
申请号:US13695487
申请日:2011-04-28
IPC分类号: B01D53/053 , B01D53/30
CPC分类号: B01D53/047 , B01D53/0446 , B01D53/053 , B01D2259/40003 , B01D2259/40009 , B01D2259/40011 , B01D2259/404
摘要: A pressure swing adsorption (PSA) system using two or more valves for controlling the flow of gases entering or exiting a bed of adsorbents is disclosed, where the two or more valves are opened sequentially (i.e., in at least two actions separated by a delay in time). The sequential opening of the valves may increase the degree to which adsorbed species are purged from the bed, and also facilitates more rapid execution of certain time steps of the PSA cycle, thus increasing adsorbent productivity The sequential opening of the valves may also allow for verification of valve operation by measuring either the absolute value, the slope (derivative) or the rate of change of derivative of the pressure, either in the adsorbent bed, in the downstream manifold, or in a volume of gas held in a buffer vessel.
摘要翻译: 公开了使用两个或更多个阀来控制进入或离开吸附剂床的气体流的变压吸附(PSA)系统,其中两个或更多个阀顺序打开(即,至少两个由延迟分开的动作) 及时)。 阀的顺序打开可以增加吸附物质从床中清除的程度,并且还有助于PSA循环的特定时间步骤的更快速执行,从而增加吸附剂生产率。顺序打开阀还可以允许验证 通过在吸附剂床,下游歧管中或在保持在缓冲容器中的气体体积中测量绝对值,斜率(导数)或压力导数的变化率。
-
公开(公告)号:US08828118B2
公开(公告)日:2014-09-09
申请号:US13695487
申请日:2011-04-28
IPC分类号: B01D53/053 , B01D53/047
CPC分类号: B01D53/047 , B01D53/0446 , B01D53/053 , B01D2259/40003 , B01D2259/40009 , B01D2259/40011 , B01D2259/404
摘要: A pressure swing adsorption (PSA) system using two or more valves for controlling the flow of gases entering or exiting a bed of adsorbents is disclosed, where the two or more valves are opened sequentially (i.e., in at least two actions separated by a delay in time). The sequential opening of the valves may increase the degree to which adsorbed species are purged from the bed, and also facilitates more rapid execution of certain time steps of the PSA cycle, thus increasing adsorbent productivity The sequential opening of the valves may also allow for verification of valve operation by measuring either the absolute value, the slope (derivative) or the rate of change of derivative of the pressure, either in the adsorbent bed, in the downstream manifold, or in a volume of gas held in a buffer vessel.
摘要翻译: 公开了使用两个或更多个阀来控制进入或离开吸附剂床的气体流的变压吸附(PSA)系统,其中两个或更多个阀顺序打开(即,至少两个由延迟分开的动作) 及时)。 阀的顺序打开可以增加吸附物质从床中清除的程度,并且还有助于PSA循环的特定时间步骤的更快速执行,从而增加吸附剂生产率。顺序打开阀还可以允许验证 通过在吸附剂床,下游歧管中或在保持在缓冲容器中的气体体积中测量绝对值,斜率(导数)或压力导数的变化率。
-