公开(公告)号:US07123976B2
公开(公告)日:2006-10-17
申请号:US11010556
申请日:2004-12-13
Applicant: Yi-Kuang Chen , Jin-Yng Hwang , Tsung-Lin Chen , Hsin-Chen Wu , Cheng-Heng Sun , Jenn-Tsair Liao , Ching-Ping Chen , Yu-Cheng Chang
Inventor: Yi-Kuang Chen , Jin-Yng Hwang , Tsung-Lin Chen , Hsin-Chen Wu , Cheng-Heng Sun , Jenn-Tsair Liao , Ching-Ping Chen , Yu-Cheng Chang
IPC: G06F19/00
CPC classification number: G06Q10/087
Abstract: A capacity management system and method. The system includes a demand management module and a planning engine. The demand management module receives a demand comprising a request for a quantity of a device and a corresponding required date. The planning engine converts original planning buckets with varying bucket lengths into target planning buckets that have substantially identical bucket lengths. The planning engine further retrieves a cycle time of the device, and selects one of the target planning buckets accordingly. The planning engine also plans a capacity in the selected target planning bucket according to the quantity of the device.
Abstract translation: 一个容量管理系统和方法。 该系统包括需求管理模块和规划引擎。 需求管理模块接收包括对设备数量和对应的所需日期的请求的需求。 规划引擎将具有不同铲斗长度的原始规划铲斗转换为具有大致相同铲斗长度的目标规划铲斗。 计划引擎进一步检索设备的循环时间,并相应地选择一个目标计划桶。 计划引擎还根据设备的数量来计划所选目标规划桶中的容量。
-
公开(公告)号:US20060129260A1
公开(公告)日:2006-06-15
申请号:US11010556
申请日:2004-12-13
Applicant: Yi-Kuang Chen , Jin-Yng Hwang , Tsung-Lin Chen , Hsin-Chen Wu , Cheng-Heng Sun , Jenn-Tsair Liao , Ching-Ping Chen , Yu-Cheng Chang
Inventor: Yi-Kuang Chen , Jin-Yng Hwang , Tsung-Lin Chen , Hsin-Chen Wu , Cheng-Heng Sun , Jenn-Tsair Liao , Ching-Ping Chen , Yu-Cheng Chang
IPC: G06F19/00
CPC classification number: G06Q10/087
Abstract: A capacity management system and method. The system includes a demand management module and a planning engine. The demand management module receives a demand comprising a request for a quantity of a device and a corresponding required date. The planning engine converts original planning buckets with varying bucket lengths into target planning buckets that have substantially identical bucket lengths. The planning engine further retrieves a cycle time of the device, and selects one of the target planning buckets accordingly. The planning engine also plans a capacity in the selected target planning bucket according to the quantity of the device.
-