Method for adhering a titanium layer on material
    1.
    发明授权
    Method for adhering a titanium layer on material 失效
    将钛层粘附在材料上的方法

    公开(公告)号:US06755929B2

    公开(公告)日:2004-06-29

    申请号:US09951365

    申请日:2001-09-13

    Abstract: A laminate forming process includes installing a heater assembly in a processing chamber, the heater assembly having a lower diffusion screen; coupling a vacuum assembly to channels of a platform; conveying layers of titanium and solid adhesive at room temperature onto a workpiece on the platform heating the processing chamber to a predetermined temperature by the heater assembly through the diffusion screen for evenly applying heat to the layers of titanium and adhesive and the workpiece and melting the layer of adhesive; and activating the vacuum assembly for sucking the layers of titanium and adhesive onto the workpiece through a communication of the channels so as to secure the layers of titanium and adhesive onto the workpiece and smooth the layer of titanium.

    Abstract translation: 层压成型工艺包括将加热器组件安装在处理室中,加热器组件具有下扩散屏; 将真空组件耦合到平台的通道; 将钛和固体粘合剂的层在室温下输送到平台上的工件上,通过加热器组件通过扩散屏将处理室加热到预定温度,以均匀地将热量施加到钛和粘合剂层和工件上并熔化层 的粘合剂; 并且通过通道的连通来激活用于将钛和粘合剂层吸附到工件上的真空组件,以便将钛和粘合剂层固定在工件上并使钛层平滑。

    Capacity management system and method
    4.
    发明授权
    Capacity management system and method 有权
    能力管理制度和方法

    公开(公告)号:US07123976B2

    公开(公告)日:2006-10-17

    申请号:US11010556

    申请日:2004-12-13

    CPC classification number: G06Q10/087

    Abstract: A capacity management system and method. The system includes a demand management module and a planning engine. The demand management module receives a demand comprising a request for a quantity of a device and a corresponding required date. The planning engine converts original planning buckets with varying bucket lengths into target planning buckets that have substantially identical bucket lengths. The planning engine further retrieves a cycle time of the device, and selects one of the target planning buckets accordingly. The planning engine also plans a capacity in the selected target planning bucket according to the quantity of the device.

    Abstract translation: 一个容量管理系统和方法。 该系统包括需求管理模块和规划引擎。 需求管理模块接收包括对设备数量和对应的所需日期的请求的需求。 规划引擎将具有不同铲斗长度的原始规划铲斗转换为具有大致相同铲斗长度的目标规划铲斗。 计划引擎进一步检索设备的循环时间,并相应地选择一个目标计划桶。 计划引擎还根据设备的数量来计划所选目标规划桶中的容量。

Patent Agency Ranking