-
公开(公告)号:US11156056B2
公开(公告)日:2021-10-26
申请号:US16857510
申请日:2020-04-24
Applicant: Craig McCormick , Scott Reynolds , Darrel Pelley
Inventor: Craig McCormick , Scott Reynolds , Darrel Pelley
IPC: E21B33/06 , E21B33/038 , E21B47/001 , E21B33/035 , E21B33/064
Abstract: In some embodiments, a method for executing an emergency disconnect sequence in shallow water depth includes unlatching a lower marine riser package (LMRP) of a blowout preventer (BOP) from a lower stack of the BOP. The BOP defines a wellbore fluidically coupled to the subsea wellhead. A tubular is disposed within the wellbore. The method further includes shearing the tubular and sealing the wellbore. In response to an indication that a vessel operably coupled to the BOP has failed to keep station, an unlatch sequence and a shear and seal sequence are initiated, such that each sequence occurs at least partially simultaneously. The unlatch sequence includes disconnecting the LMRP from the lower stack, and the shear and seal sequence includes activating the lower stack to shear the tubular in less than about one second and seal the wellbore.
-
2.
公开(公告)号:US20200340324A1
公开(公告)日:2020-10-29
申请号:US16857510
申请日:2020-04-24
Applicant: Craig MCCORMICK , Scott REYNOLDS , Darrel PELLEY , Bobby GALLAGHER
Inventor: Craig MCCORMICK , Scott REYNOLDS , Darrel PELLEY , Bobby GALLAGHER
IPC: E21B33/06 , E21B33/038 , E21B33/064 , E21B33/035 , E21B47/001
Abstract: In some embodiments, a method for executing an emergency disconnect sequence in shallow water depth includes unlatching a lower marine riser package (LMRP) of a blowout preventer (BOP) from a lower stack of the BOP. The BOP defines a wellbore fluidically coupled to the subsea wellhead. A tubular is disposed within the wellbore. The method further includes shearing the tubular and sealing the wellbore. In response to an indication that a vessel operably coupled to the BOP has failed to keep station, an unlatch sequence and a shear and seal sequence are initiated, such that each sequence occurs at least partially simultaneously. The unlatch sequence includes disconnecting the LMRP from the lower stack, and the shear and seal sequence includes activating the lower stack to shear the tubular in less than about one second and seal the wellbore.
-