-
公开(公告)号:US09175547B2
公开(公告)日:2015-11-03
申请号:US12133332
申请日:2008-06-04
申请人: Randy J. Vaal , Fernando Gutierrez , Daniel Colin Nesbitt Lucas-Clements , Michael Stundner , Andrew John Howell
发明人: Randy J. Vaal , Fernando Gutierrez , Daniel Colin Nesbitt Lucas-Clements , Michael Stundner , Andrew John Howell
CPC分类号: E21B41/00 , E21B43/00 , G06Q10/06312 , G06Q10/06316
摘要: The invention relates to a method of performing production operations of an oilfield having at least one process facility and at least one wellsite operatively connected thereto, each at least one wellsite having a wellbore penetrating a subterranean formation for extracting fluid from an underground reservoir therein. The method steps include receiving a number of steps each from at least one of a number of collaborators, specifying an automated workflow including the number of steps and for generating a first well plan, obtaining first data associated with the production operations, applying the automated workflow to the first data to generate the first well plan, adjusting the production operations based on the first well plan, and modifying at least one of the number of steps based on input from at least one of the number of collaborators to generate an updated automated workflow.
摘要翻译: 本发明涉及一种执行油田生产操作的方法,该油田具有至少一个处理设施和至少一个与其可操作连接的井场,每个至少一个井场具有渗透地下地层的井眼,用于从其中的地下储层中提取流体。 所述方法步骤包括从多个协作者中的至少一个接收多个步骤,指定包括步骤数量的自动化工作流程和用于生成第一井计划,获得与生产操作相关联的第一数据,应用自动化工作流程 所述第一数据生成所述第一井计划,基于所述第一井计划调整所述生产操作,以及基于来自所述多个协作者中的至少一个的输入来修改所述多个步骤中的至少一个以生成更新的自动化工作流程 。
-
公开(公告)号:US20100042458A1
公开(公告)日:2010-02-18
申请号:US12534962
申请日:2009-08-04
申请人: Kashif Rashid , Daniel Colin Nesbitt Lucas-Clements , Aron Edward Hallquist , Michael Huber , Trevor Graham Tonkin , Andrew Michael Shand
发明人: Kashif Rashid , Daniel Colin Nesbitt Lucas-Clements , Aron Edward Hallquist , Michael Huber , Trevor Graham Tonkin , Andrew Michael Shand
CPC分类号: G06Q10/04 , E21B43/122
摘要: Methods and systems for performing well network production optimizations are described. For example, in one embodiment, a method of allocating an applied resource throughout a well network includes receiving topological data into an analytical model of a well network having one or more wells. The topological data includes a plurality of performance curves that relate well performance to one or more levels of an applied resource. The method also includes determining an optimum allocation of the applied resource using the analytical model to maximize an operating parameter of the well network, including converting a portion the analytical model having one or more wells and a linear inequality relationship to a modified portion having a single variable and a linear equality constraint.
摘要翻译: 描述了用于执行良好网络生产优化的方法和系统。 例如,在一个实施例中,在整个井网络中分配应用资源的方法包括将拓扑数据接收到具有一个或多个井的井网络的分析模型中。 拓扑数据包括将井性能与应用资源的一个或多个级别相关联的多个性能曲线。 该方法还包括使用分析模型来确定应用资源的最佳分配,以最大化井网络的运行参数,包括将具有一个或多个井的分析模型和线性不等式关系的部分转换为具有单个 变量和线性等式约束。
-
公开(公告)号:US20080306803A1
公开(公告)日:2008-12-11
申请号:US12133332
申请日:2008-06-04
申请人: Randy J. Vaal , Fernando Gutierrez , Daniel Colin Nesbitt Lucas-Clements , Michael Stundner , Andrew John Howell
发明人: Randy J. Vaal , Fernando Gutierrez , Daniel Colin Nesbitt Lucas-Clements , Michael Stundner , Andrew John Howell
IPC分类号: G05B19/418
CPC分类号: E21B41/00 , E21B43/00 , G06Q10/06312 , G06Q10/06316
摘要: The invention relates to a method of performing production operations of an oilfield having at least one process facility and at least one wellsite operatively connected thereto, each at least one wellsite having a wellbore penetrating a subterranean formation for extracting fluid from an underground reservoir therein. The method steps include receiving a number of steps each from at least one of a number of collaborators, specifying an automated workflow including the number of steps and for generating a first well plan, obtaining first data associated with the production operations, applying the automated workflow to the first data to generate the first well plan, adjusting the production operations based on the first well plan, and modifying at least one of the number of steps based on input from at least one of the number of collaborators to generate an updated automated workflow.
摘要翻译: 本发明涉及一种执行油田生产操作的方法,该油田具有至少一个处理设施和至少一个与其可操作连接的井场,每个至少一个井场具有渗透地下地层的井眼,用于从其中的地下储层中提取流体。 所述方法步骤包括从多个协作者中的至少一个接收多个步骤,指定包括步骤数量的自动化工作流程和用于生成第一井计划,获得与生产操作相关联的第一数据,应用自动化工作流程 所述第一数据生成所述第一井计划,基于所述第一井计划调整所述生产操作,以及基于来自所述多个协作者中的至少一个的输入来修改所述多个步骤中的至少一个以生成更新的自动化工作流程 。
-
公开(公告)号:US08670966B2
公开(公告)日:2014-03-11
申请号:US12534962
申请日:2009-08-04
申请人: Kashif Rashid , Daniel Colin-Nesbitt Lucas-Clements , Aron Edward Hallquist , Michael Huber , Trevor Graham Tonkin , Andrew Michael Shand
发明人: Kashif Rashid , Daniel Colin-Nesbitt Lucas-Clements , Aron Edward Hallquist , Michael Huber , Trevor Graham Tonkin , Andrew Michael Shand
CPC分类号: G06Q10/04 , E21B43/122
摘要: Methods and systems for performing well network production optimizations are described. For example, in one embodiment, a method of allocating an applied resource throughout a well network includes receiving topological data into an analytical model of a well network having one or more wells. The topological data includes a plurality of performance curves that relate well performance to one or more levels of an applied resource. The method also includes determining an optimum allocation of the applied resource using the analytical model to maximize an operating parameter of the well network, including converting a portion the analytical model having one or more wells and a linear inequality relationship to a modified portion having a single variable and a linear equality constraint.
摘要翻译: 描述了用于执行良好网络生产优化的方法和系统。 例如,在一个实施例中,在整个井网络中分配应用资源的方法包括将拓扑数据接收到具有一个或多个井的井网络的分析模型中。 拓扑数据包括将井性能与应用资源的一个或多个级别相关联的多个性能曲线。 该方法还包括使用分析模型来确定应用资源的最佳分配,以最大化井网络的运行参数,包括将具有一个或多个井的分析模型和线性不等式关系的部分转换为具有单个 变量和线性等式约束。
-
-
-