-
公开(公告)号:US06736221B2
公开(公告)日:2004-05-18
申请号:US10028864
申请日:2001-12-21
IPC分类号: E21B4700
CPC分类号: E21B47/022
摘要: A method is disclosed which utilizes multiple overlapping surveys to estimate a position in a wellbore and related position uncertainty. Multiple surveys are often taken over the same portion of a wellbore either concurrently or sequentially and/or using various instruments. Each survey generates an estimated survey position and related uncertainty for a given location in the wellbore. By combining the estimated survey positions and uncertainties for these overlapping surveys, a resultant position and related ellipsoid of uncertainty is estimated. This resultant position estimates a position in the wellbore by incorporating the estimated survey positions and uncertainties of multiple overlapping surveys.
摘要翻译: 公开了一种利用多重重叠测量来估计井眼位置和相关位置不确定性的方法。 多次调查通常同时或顺序地和/或使用各种仪器在井筒的相同部分上进行。 每个调查都会产生一个估计的测量位置和井筒中给定位置的相关不确定性。 通过将这些重叠调查的估计调查位置和不确定度相结合,估算出不确定性的结果位置和相关椭圆体。 这个结果的位置通过纳入多个重叠调查的估计调查位置和不确定性来估计井筒中的位置。
-
公开(公告)号:US07460957B2
公开(公告)日:2008-12-02
申请号:US11300496
申请日:2005-12-14
CPC分类号: E21B47/022 , E21B7/04 , E21B43/305
摘要: A novel method is presented to automatically design a multi-well development plan given a set of previously interpreted subsurface targets. This method identifies the optimal plan by minimizing the total cost as a function of existing and required new platforms, the number of wells, and the drilling cost of each of the wells. The cost of each well is a function of the well path and the overall complexity of the well.
摘要翻译: 提出了一种新颖的方法来自动设计一个以前解释的地下目标集合的多井开发计划。 该方法通过将总成本最小化为现有和所需的新平台,井数以及每个井的钻井成本的函数来确定最优计划。 每个井的成本是井的路径和井的整体复杂度的函数。
-
公开(公告)号:US20090056935A1
公开(公告)日:2009-03-05
申请号:US12263668
申请日:2008-11-03
IPC分类号: E21B43/30
CPC分类号: E21B47/022 , E21B7/04 , E21B43/305
摘要: A novel method is presented to automatically design a multi-well development plan given a set of previously interpreted subsurface targets. This method identifies the optimal plan by minimizing the total cost as a function of existing and required new platforms, the number of wells, and the drilling cost of each of the wells. The cost of each well is a function of the well path and the overall complexity of the well.
摘要翻译: 提出了一种新颖的方法来自动设计一个以前解释的地下目标集合的多井开发计划。 该方法通过将总成本最小化为现有和所需的新平台,井数以及每个井的钻井成本的函数来确定最优计划。 每个井的成本是井的路径和井的整体复杂度的函数。
-
-