Abstract:
The disclosure provides a method and system of coupling end-to-end at least two existing mooring lines (12A, 12B) that are already deployed from the floating platform (56) to the seabed or other connecting structure to create a single shared line from the two lines. The shared lines then form a single looped line with both ends deployed to the subsea connections. The shared length provides enough payout of line to loosen one line sufficiently, while the other line becomes correspondingly tighter using the catenary length of the tight line. In part, the line can be loosened while the other is tightened because the lines are generally in the same overall direction to the seabed, such as in a same quadrant around the platform. Thus, the lines share their available lengths to provide the necessary payout for the repairs.
Abstract:
The disclosure provides an efficient system to obtain a pile from a storage location on a vessel and shift the pile across the vessel without significant rotation of the pile. The pile can be transferred into an assembly that can lower the pile and launch the pile. The disclosure provides a method of translating and launching a pile for a marine application, comprising: storing at least a first pile on a rack located on a vessel; transporting the pile to an installation site; lifting the pile from the rack with a cart; supporting the pile on the cart; shifting the cart and the pile to a launch arm assembly; transferring the pile from the cart to a first portion of the launch arm assembly adjacent a side of the vessel; lowering the first portion with the pile; and releasing the pile from the first portion into a marine environment.
Abstract:
The disclosure provides a method and system of coupling end-to-end at least two existing mooring lines (12A, 12B) that are already deployed from the floating platform (56) to the seabed or other connecting structure to create a single shared line from the two lines. The shared lines then form a single looped line with both ends deployed to the subsea connections. The shared length provides enough payout of line to loosen one line sufficiently, while the other line becomes correspondingly tighter using the catenary length of the tight line. In part, the line can be loosened while the other is tightened because the lines are generally in the same overall direction to the seabed, such as in a same quadrant around the platform. Thus, the lines share their available lengths to provide the necessary payout for the repairs.
Abstract:
The disclosure provides a vessel with a double pontoon arrangement joined together with a central bridge creating an offset “H” arrangement. The bridge spans the pontoons and includes a gantry structure on top of which sits a lifting system. Articulated tugs provide accommodation, propulsion, and power to the main part of the installation vessel. Additional lifting devices can be installed within the gantry to provide further lifting capability. At least two stabilizing legs are provided along each pontoon. Once set up onsite, the stabilizing legs can be deployed to the seabed to lift the installation vessel up a short distance to apply load stability during lifting operations. Seabed piles, mast elements, and turbine elements are delivered by barges that are temporarily moored between the pontoons for offloading and installation. Empty barges are relocated, and successive barges bring remaining elements for offloading and installation to complete the wind turbine installation.
Abstract:
The disclosure provides an efficient system to obtain a pile from a storage location on a vessel and shift the pile across the vessel without significant rotation of the pile. The pile can be transferred into an assembly that can lower the pile and launch the pile. The disclosure provides a method of translating and launching a pile for a marine application, comprising: storing at least a first pile on a rack located on a vessel; transporting the pile to an installation site; lifting the pile from the rack with a cart; supporting the pile on the cart; shifting the cart and the pile to a launch arm assembly; transferring the pile from the cart to a first portion of the launch arm assembly adjacent a side of the vessel; lowering the first portion with the pile; and releasing the pile from the first portion into a marine environment.
Abstract:
The present invention provides a system and method that keeps a barge and grillage system on the barge in compression with a topsides supported by the grillage system during the transport, while providing a quick release system between the barge, grillage system, and topsides during an installation procedure that transfers the topsides to an offshore platform. The quick release system can be in tension to apply a compressive force between the grillage system and the topsides until the quick release system is released.
Abstract:
The present invention provides a system and method that keeps a barge and grillage system on the barge in compression with a topsides supported by the grillage system during the transport, while providing a quick release system between the barge, grillage system, and topsides during an installation procedure that transfers the topsides to an offshore platform. The quick release system can be in tension to apply a compressive force between the grillage system and the topsides until the quick release system is released.