Railroad track fixation method and apparatus
    1.
    发明授权
    Railroad track fixation method and apparatus 失效
    铁轨固定方法及装置

    公开(公告)号:US4616395A

    公开(公告)日:1986-10-14

    申请号:US510087

    申请日:1983-06-30

    摘要: A method and apparatus for laying a railroad track includes laying, in tandem, a series of pre-cast concrete slabs on a prepared track bed, the slabs being isolated from the bed, and from each other, by rubber isolation pads, and the slabs having cavities formed on the top faces. The rails are held above the slabs, in their proper location, by removable gauge beams having adjustment means to exactly locate the rails. Before filling the cavities with concrete the shoulder-pins, used to secure the rails, are located with their pin portions in the cavities by being removably secured to templates. The templates are held suspended above the slabs by being removably attached to a rail. The rails are used as guides after setting their exact gauge (separation), elevation and cant (angle of inclination) on the gauge beams, to determine the positions of the templates and shoulder-pins. The cavities are filled to the level of the templates with concrete and, after the concrete hardens, the rails are lifted, the templates are removed and rails are lowered into place.

    摘要翻译: 一种用于铺设铁路轨道的方法和装置包括:在准备的轨道床上串联铺设一系列预制混凝土板,所述板坯与所述床隔离,并且由橡胶隔离垫彼此隔开,并且所述板坯 具有形成在顶面上的空腔。 轨道通过具有调节装置的可移动的规格梁将它们保持在板坯的正上方。 在用混凝土填充空腔之前,用于固定导轨的肩销通过可拆卸地固定到模板上而将其销部分定位在空腔中。 模板通过可拆卸地连接到轨道上而悬挂在板上方。 将轨道设置在测量杆上的精确测量(分离),仰角和倾斜角(倾斜角度)后,用作导轨,以确定模板和肩针的位置。 将空腔用混凝土填充到模板的水平面上,并且在混凝土硬化之后,将导轨提起,模板被移除并且导轨被降低到位。