-
公开(公告)号:US4076474A
公开(公告)日:1978-02-28
申请号:US771170
申请日:1977-02-22
CPC分类号: B28B1/0935 , B28B1/084 , E01C19/4893 , B28B1/093
摘要: Apparatus for slip forming concrete, having a form, and a hopper for receiving concrete and introducing the same into said form, and incorporating water extraction means, adapted to be positioned in the wet concrete, for extracting water therefrom thereby producing a more stable formed concrete mass, capable of standing on its own after the form has moved on.
摘要翻译: 具有形式的混凝土成型装置和用于接收混凝土的料斗并将其引入所述形式的装置,并且包括适于定位在湿混凝土中的水提取装置,用于从中提取水从而产生更稳定的成形混凝土 在形式发生后,能够自行站立。
-
公开(公告)号:US4101237A
公开(公告)日:1978-07-18
申请号:US825129
申请日:1977-08-16
IPC分类号: E01C19/40
CPC分类号: E01C19/407
摘要: A roadbed and a curb are formed as a single integral structure by slip-forming concrete material using a tracked vehicle supporting a roadbed slip-form and a curb slip-form which extend along opposite sides of a track of the vehicle so leaving a gap between the formed roadbed and curb to allow passage of the vehicle track. A filler portion of concrete material passes rearwardly through a passageway in the roadbed slip-form above the final top surface of the roadbed and such filler portion of concrete material is transferred transversely outwardly to fill such a gap rearwardly of the vehicle track. Finally, the top surface of the material so transferred and that of the roadbed from where such material was transferred are smoothed.
摘要翻译: 路基和路边通过使用支撑路基滑动形式的轨道车辆和沿着车辆轨道的相对侧延伸的路缘滑移形式的滑动形成混凝土材料形成为单个整体结构,从而在车辆的轨道之间留有间隙 形成的路基和路缘,以允许车辆轨道通过。 混凝土材料的填料部分向后穿过路基最终上表面之上的路基滑动通道的通道,并且混凝土材料的这种填充部分横向向外移动以填充车辆轨道后面的这种间隙。 最后,如此转移的材料的顶表面以及从这些材料被转移的路基的表面是平滑的。
-
公开(公告)号:US3363524A
公开(公告)日:1968-01-16
申请号:US52436865
申请日:1965-12-28
IPC分类号: E01C19/48
CPC分类号: E01C19/4893 , Y10S425/132
-
-