-
公开(公告)号:US20240042648A1
公开(公告)日:2024-02-08
申请号:US18378595
申请日:2023-10-10
Applicant: Inner Mongolia University of Technology , Inner Mongolian Grand Architecture Design CO., LTD.
Inventor: Pengju Zhang , Lagenbaier Zha , Liangang Tong , Hehada Hu
CPC classification number: B28C1/16 , B28C3/00 , C04B33/04 , C04B33/132 , C04B33/32 , C04B38/0665 , B28B1/16
Abstract: A pore-forming microsphere homogenizing device and method include steps of: firstly homogenizing the pore-forming microspheres made of the cow dung into the clay paste; secondly homogenizing the materials by using the kneading gear and the ejection cylinder rotating in opposite directions for kneading the clay paste while ejecting the pore-forming microspheres; and thirdly homogenizing the materials by using the telescopic kneading part and the ejection cylinder together for further kneading the clay paste while ejecting the pore-forming microspheres. With the foregoing processes, uniform and complete closed pores are uniformly distributed in the clay bricks, so that the strength of the clay bricks remains unchanged while clay usage is reduced.
-
公开(公告)号:US20240035299A1
公开(公告)日:2024-02-01
申请号:US18378601
申请日:2023-10-10
Applicant: Inner Mongolia University of Technology , Inner Mongolian Grand Architecture Design CO., LTD.
Inventor: Pengju Zhang , Lagenbaier Zha , Long He , Guoqiang Xu , Liyan Bai
CPC classification number: E04H15/008 , E04H15/34
Abstract: A pole yurt framing structure system includes: a crown wheel, a roof pole, and a lattice wall; wherein the crown wheel is a prismatic conical structure formed by multiple triangular first pole orthogonally stacked wooden rib structures; the roof pole comprises multiple rectangular second pole orthogonally stacked wooden rib structures and multiple triangular third pole orthogonally stacked wooden rib structures; and the lattice wall comprises at least one cuboid frame and multiple rectangular frames. A construction method of the pole yurt framing structure system uses assembly technology. The composite wooden poles with the same specifications are prefabricated by the factory, which are assembled on site to form the pole orthogonally stacked wooden rib structures. Finally, the pole yurt framing can be obtained. The technical scheme reduces the production and design cost, and reduces environment pollution caused by the construction.
-