-
公开(公告)号:US5794446A
公开(公告)日:1998-08-18
申请号:US738932
申请日:1996-10-28
CPC分类号: F01K7/345
摘要: A steam powered electric power generating station to provide electricity comprises a steam turbine positioned in a steam turbine shell, equipment, such as a heater, a first and a second temperature detector, and a computer. The steam turbine has necessary blades and a rod to turn an electrical generator to create electricity. The steam turbine shell mechanically coupled to receive steam to turn the at least one blade steam turbine. The equipment is mechanically coupled to the steam turbine shell to receive steam from the steam turbine shell and receives feed water through an entry port and releases feed water heater through an exit port. The first temperature detector is positioned to detect a first temperature of the feed water prior to entering the equipment via the entry port. The second temperature detector is positioned to detect a second temperature of the feed water after exiting the first piece of feed water via the exit port. The computer is electrically coupled to the first temperature detector and to the second temperature detector and compares the first temperature to the second temperature to generate a temperature difference which is used to monitor station performance. Related processes comprise detecting a first temperature of feed water immediately before the feed water has entered heating equipment and a second temperature of the feed water immediately after the feed water has entered the heating equipment; comparing the first temperature to the second temperature to generate a temperature difference therebetween comparing the temperature difference with a preferred temperature difference to determine whether the temperature difference is within an approved range from the preferred temperature difference; generating a warning signal to alert the power plant operator if the temperature difference is not within the approved range; and taking corrective action to keep the station operating at desired efficiency levels.
-
公开(公告)号:US5791147A
公开(公告)日:1998-08-11
申请号:US739140
申请日:1996-10-28
CPC分类号: F22D1/325
摘要: A steam powered electric power generating station to provide electricity comprises a steam turbine positioned in a steam turbine shell, equipment, such as a heater, a first and a second temperature detectors, and a computer. The steam turbine has necessary blades and a shaft to turn an electrical generator to create electricity. The steam turbine shell mechanically coupled to receive steam to turn the at least one blade steam turbine. The equipment is mechanically coupled to the steam turbine shell to receive steam from the steam turbine shell and receives feed water through an entry port and releases feed water through an exit port. The first temperature detector is positioned to detect a first temperature of the feed water prior to entering the equipment via the entry port. The second temperature detector is positioned to detect a second temperature of the feed water after exiting the equipment via the exit port. The computer is electrically coupled to the first temperature detector and to the second temperature detector and compares the first temperature to the second temperature to generate a temperature difference. Related processes comprise detecting a first temperature of feed water immediately before the feed water has exited the heating equipment; detecting a second temperature of the feed water immediately after the feed water has entered the heating equipment; (c) comparing the first temperature to the second temperature to generate a temperature difference between the first temperature and the second temperature; (d) comparing the temperature difference with a preferred temperature difference to determine whether the temperature difference is within an approved range from the preferred temperature difference; and (e) generating a warning signal to alert the power plant operator if the temperature difference is not within the approved range.
摘要翻译: 用于提供电力的蒸汽动力发电站包括定位在蒸汽涡轮壳体中的蒸汽轮机,诸如加热器,第一和第二温度检测器以及计算机的设备。 蒸汽轮机具有必需的叶片和轴,以转动发电机以产生电力。 汽轮机壳机械连接以接收蒸汽以转动至少一个叶片汽轮机。 该设备机械地联接到汽轮机壳体以接收来自蒸汽轮机壳体的蒸汽并且通过入口端口接收给水并且通过出口排放给水。 第一温度检测器定位成在通过入口进入设备之前检测给水的第一温度。 第二温度检测器定位成在经由出口离开设备之后检测供水的第二温度。 计算机电耦合到第一温度检测器和第二温度检测器,并将第一温度与第二温度进行比较以产生温度差。 相关过程包括在供水已经退出加热设备之前立即检测给水的第一温度; 在供水进入加热设备之后立即检测供水的第二温度; (c)比较第一温度与第二温度以产生第一温度和第二温度之间的温度差; (d)将温度差与优选的温度差进行比较,以确定温度差是否在优选温度差的允许范围内; 以及(e)如果温度差不在允许范围内,则产生警告信号以警告发电厂操作者。
-