-
公开(公告)号:US5566518A
公开(公告)日:1996-10-22
申请号:US334279
申请日:1994-11-04
CPC分类号: E04B2/8652
摘要: A concrete form tie comprises a pair of laterally displaced sidewall support assemblies with a reinforcing web extending therebetween. The support assemblies bite into the exterior sidewall surfaces as positioned thereat by the web transversely extending between the support assemblies. The web comprises a pair of brackets as formed by a support strut extending through a notch at the top of the form sidewall with a hanger element depending therefrom. A bridge extends between the depending hangers and across a vertical cavity formed between the sidewalls. The tie resists pressures acting on the sidewalls to preclude blow out along the horizontal joints of form courses as well as lateral displacement of the sidewalls. A starter tie is disclosed for respectively securing the lower end of the first course of sidewalls to a footing. A finish tie is disclosed for maintaining the displacement of the sidewalls of the top course of forms.
摘要翻译: 混凝土结构包括一对侧向移位的侧壁支撑组件,其中在其间延伸有加强腹板。 支撑组件咬合到外侧壁表面中,由位于支撑组件之间横向延伸的腹板定位。 腹板包括一对托架,由支撑支柱形成,支撑支柱延伸穿过形式侧壁的顶部处的凹口和从其悬挂的衣架元件。 桥接器在垂直悬挂器之间延伸并且跨越形成在侧壁之间的垂直空腔。 连接件抵抗作用在侧壁上的压力,以防止沿着横向的水平接头以及侧壁的横向位移而吹出。 公开了一种用于分别将第一道路侧壁的下端固定到基脚的起动器扎带。 公开了一种用于保持顶部形式的侧壁的位移的表带。
-
公开(公告)号:US5454199A
公开(公告)日:1995-10-03
申请号:US269549
申请日:1994-07-01
CPC分类号: E04B2/8605 , E04B2/8617
摘要: A wall clip for use with a concrete form comprises a vertical nailing surface or stud for receiving fasteners of finishing material therethrough. Linkage structures extend upper and lower anchors from the upper and lower ends of the stud and into the cavity between the form sidewalls. The anchors maintain the stud along the sidewalls during concrete pouring, curing and subsequent material fastening. The anchors further reinforce the concrete laden form.
摘要翻译: 用于混凝土形式的墙夹包括用于接收整理材料的紧固件的垂直钉表面或螺柱。 连接结构将上部和下部锚固件从螺栓的上端和下端延伸到形成侧壁之间的空腔中。 在混凝土浇注,固化和随后的材料紧固期间,锚固件沿着侧壁保持螺栓。 锚点进一步加强了混凝土载荷。
-