Demand-driven scheduling system and method
    1.
    发明授权
    Demand-driven scheduling system and method 有权
    需求驱动调度系统和方法

    公开(公告)号:US06973359B2

    公开(公告)日:2005-12-06

    申请号:US10251636

    申请日:2002-09-19

    IPC分类号: G05B19/418 G06F19/00

    摘要: A process is scheduled based on one or more tasks identified as control tasks from a set of tasks comprising part of a job. A desired work-in-progress load time level is set for each of the identified control tasks, and a time load on each of the identified control tasks is determined for each new job, each new job comprising one or more tasks. New jobs are released based on the desired work-in-progress load time level for one or more control tasks to approximately maintain the set desired work-in-progress load time level.

    摘要翻译: 基于从包括作业的一部分的一组任务中识别为控制任务的一个或多个任务来调度进程。 为每个所识别的控制任务设置期望的在制品加载时间级别,并且为每个新作业确定每个所识别的控制任务上的时间负载,每个新作业包括一个或多个任务。 基于针对一个或多个控制任务的期望的工作进程加载时间级别来释放新作业,以大致维持所设置的所需工作进行中加载时间级别。