公开(公告)号:US06487518B1
公开(公告)日:2002-11-26
申请号:US09598050
申请日:2000-06-21
IPC分类号: G01B1102
CPC分类号: G01B21/085
摘要: In a thickness reducing management for pipes in pipe lines, limited proper parameters which cause erosion and corrosion of the pipes are selected and with these parameters a pipe thickness reducing speed evaluation model formulas are constructed, and by making use of the model formulas thickness reducing amount of the pipes is evaluated. Thereby, conventional difficulty of formulating a proper pipe thickness reducing estimation model formula in view of actual pipe material and pipe inner fluid state because of too many possibly influential parameters causing pipe thickness reducing due to erosion and corrosion, and conventional difficulty of performing highly reliable pipe thickness reducing management are overcome.
摘要翻译: 在管道管道的厚度减少管理中,选择引起管道腐蚀和腐蚀的有限的适当参数,并通过这些参数构建管道厚度降低速度评估模型公式,并通过使用模型公式减薄量 的管道进行评估。 因此,考虑到实际的管材和管内流体状态,由于侵蚀和腐蚀导致管材厚度减少的可能影响参数太多,制定适当的管道厚度减小估计模型公式的常规难点,以及执行高可靠性管道的常规难题 克服了减薄管理。