-
公开(公告)号:US06522972B2
公开(公告)日:2003-02-18
申请号:US09907973
申请日:2001-07-18
申请人: Preston W Helms
发明人: Preston W Helms
IPC分类号: G01W100
CPC分类号: E03F1/00
摘要: A method for producing a more accurate instantaneous unit hydrograph particularly for urban areas and for use in specifying the capacities of structures engineered to manage surface water runoff at the watershed catchment. The method uses map data verified by on-site inspections to obtain the input for the computer-performed calculation of initial probabilities, transition probabilities and mean waiting times, and subsequently the instantaneous unit hydrograph. This data includes the areas, links between streams, and slopes of various parts of the watershed.
摘要翻译: 一种特别用于城市地区的更准确的瞬时单位水文图的制作方法,用于指定在流域集水区管理地表水径流的结构设计能力。 该方法使用通过现场检查验证的地图数据来获取计算机执行初始概率计算,转换概率和平均等待时间的输入,以及随后的瞬时单位水文图。 该数据包括流域之间的区域,链接以及流域各部分的斜率。