-
公开(公告)号:US20110272402A1
公开(公告)日:2011-11-10
申请号:US13102427
申请日:2011-05-06
IPC分类号: B65D90/00
CPC分类号: E21F17/107 , E21F15/02
摘要: A barrier for a passage is configured to close off a zone in an enclosed environment, for example for a drift in a mine to close off a zone in the mine. The container may be least partially flexible and expandable, by being formed of woven fabric. A supply pipe for an hydraulic fill extending from outside the zone into the zone, and a drainage pipe can be provided for permitting fluid to drain from the zone. These pipes may extend through or around the container. After placing the container in the passage, the container is expanded to form a barrier in the passage, to close of the zone, except for the pipes. The container is filled with hydraulic fill, e.g a slurry. After forming the barrier, further hydraulic fill is supplied to the zone to fill the zone, with the barriers containing the fill in the desired location.
摘要翻译: 通道的障碍物被配置为在封闭的环境中关闭区域,例如用于矿井中的漂移以关闭矿井中的区域。 通过由机织织物形成的容器可以是最少部分柔性和可膨胀的。 用于从外部区域延伸到区域中的用于液压填充物的供应管道和排水管道可以被设置成允许流体从该区域排出。 这些管道可以延伸通过或围绕容器。 在将容器放置在通道中之后,容器被膨胀以在通道中形成隔离物,除了管道之外,使其与该区域相邻。 容器充满液压填料,例如浆料。 在形成障碍物之后,将进一步的液压填充物供应到区域以填充区域,其中障碍物将填充物填充在期望的位置。
-
公开(公告)号:US20110107576A1
公开(公告)日:2011-05-12
申请号:US12940165
申请日:2010-11-05
CPC分类号: B23D45/003 , B23D45/146 , B23D47/02 , B27C1/08 , B27C5/10 , B27F1/06 , Y10T29/49718 , Y10T83/68
摘要: An apparatus for refurbishing an elevator guide post includes at least one cutting mechanism configured to remove material along a side face of the guide post to expose a new side face. Material can be removed from two side faces of the guide post new side faces on generally opposing sides of the guide post. Replacement boards can be installed onto the new side faces so that desired dimensions of the guide post are formed.
摘要翻译: 一种用于翻新电梯导杆的装置包括至少一个切割机构,其被配置成沿着导柱的侧面移除材料以暴露新的侧面。 材料可以从导向柱的两个侧面移除,导向柱的大致相对的侧面上的新侧面。 替换板可以安装在新的侧面上,从而形成导柱的所需尺寸。
-