Collar load support system and method

    公开(公告)号:US06651737B2

    公开(公告)日:2003-11-25

    申请号:US09769044

    申请日:2001-01-24

    IPC分类号: E21B304

    摘要: A wellbore tubular handling system and method is provided for operation in holding and lowering tubulars, such as tubing strings, casing strings, pipe strings, and the various components thereof, at a rig site. The handling system utilizes a shock table with a compressible support surface that compressively moves with a selected compression rate in response to the weight of the wellbore tubular string. The shock table preferably has a shock table body mounted below the rig floor and may conveniently replace the rotary table master bushing except for a flange which supports the shock table on the rig floor. A split-sectioned landing spear can be split open to an open position to thereby allow large items such as collars or other string components to pass through the shock table. In a closed position, the landing spear supports, preferably indirectly, an upper collar of the wellbore tubular string to thereby support the weight of the wellbore tubular string and apply the weight to the compressible support surface of the shock table.

    Control line guide and method of using same
    2.
    发明授权
    Control line guide and method of using same 有权
    控制线导轨及其使用方法

    公开(公告)号:US07222677B2

    公开(公告)日:2007-05-29

    申请号:US10995905

    申请日:2004-11-24

    IPC分类号: E21B19/22

    摘要: A control line guide and manipulating arm can protect and guide one or more control lines which are desired to be attached and lowered into a wellbore with a tubular string. The control lines may be moved toward a tubular string, can be clamped to the tubular string, and the tubular string and control lines may be lowered into the wellbore. When the elevator reaches a predetermined position, the spider slips are preferably set. To protect the control lines, the control lines are moved in a substantially radial direction outward from the tubular string. The spider slips are closed only after the control lines are retained outward. After another tubular joint is connected to the tubular string and the elevator grips the tubular string, the spider slips are preferably released. For easier attachment, of the control lines to the tubular string, the control lines are moved in a substantially radial direction toward the tubular string. As the tubular string and the control lines are lowered into the wellbore, the manipulator arm may again begin retracting to move the control lines away from the approaching elevator as well as to move the control lines out of the way of the movement of the spider slips. The control line guide, which preferably passes through the spider, protects the control lines from the spider slips by allowing the control lines to remain outside the path of the spider slips as they open and close.

    摘要翻译: 控制线引导和操纵臂可以保护并引导一个或多个期望用管状柱连接和降低到井眼中的控制线。 控制线可以朝向管状柱移动,可以被夹紧到管状管柱上,并且管状管柱和控制管线可以降低到井筒中。 当电梯到达预定位置时,优选地设置蜘蛛滑块。 为了保护控制线,控制线从管状柱体向外向大致径向方向移动。 只有控制线保持向外,才能关闭蜘蛛滑块。 在另一个管状接头连接到管状管柱并且电梯夹住管状管柱之后,优选释放蜘蛛撬。 为了更容易地将控制线连接到管状串,控制线在大致径向方向上朝着管状柱移动。 当管状管线和控制管线下降到井筒中时,操纵臂可以再次开始缩回以将控制线移动离开接近的电梯,并且将控制线移动到远离蜘蛛侠的运动的方式 。 优选地穿过蜘蛛的控制线引导件通过允许控制线在打开和关闭时保持在蜘蛛撬的路径之外,从而保护控制线免受蜘蛛撬。

    Control line guide
    3.
    发明授权
    Control line guide 有权
    控制线指导

    公开(公告)号:US06920931B1

    公开(公告)日:2005-07-26

    申请号:US10315617

    申请日:2002-12-10

    IPC分类号: E21B17/02 E21B19/10 E21B19/22

    摘要: When the spider slips are open, the control line can be moved toward the pipe string, can be clamped to the pie string and string and line can be lowered into the well. When the pipe connector approaches the spider, the spider slips need to be set. To move the control line into a safe area, it is thrust radially outward from the pipe string. The slips are closed while the line is retained outward.To keep them safe while work proceeds just above the spider an optional trap is closed to retain the control lines until the spider slips are opened. The lines can be manually pulled outward but it is more easily done with a powered thruster. Optional sequencing controls can start with moving the control line away from the pipe, closing the line trap, and closing the spider slips. Reversing the procedure, the sequencing controls open the spider slips, release the line trap, and moves the line toward the pipe.

    摘要翻译: 当蜘蛛滑块打开时,控制线可以向管柱移动,可以夹紧到管柱,并将管线下降到井中。 当管道连接器接近蜘蛛时,需要设置蜘蛛滑块。 为了将控制线移动到安全区域,它从管柱径向向外推。 当线条保持向外时,滑块关闭。 为了保持安全,而工作在蜘蛛上方进行,可选的陷阱是闭合的,以保持控制线,直到蜘蛛滑块打开。 线路可以手动向外拉,但用动力推进器更容易完成。 可选的排序控制可以从控制线移开管道,关闭线路陷阱,并关闭蜘蛛侠。 逆转程序,顺序控制打开蜘蛛滑块,释放线路陷阱,并将线路向管道移动。