METHOD FOR LOW LOAD OPERATION OF A POWER PLANT WITH A ONCE-THROUGH BOILER
    1.
    发明申请
    METHOD FOR LOW LOAD OPERATION OF A POWER PLANT WITH A ONCE-THROUGH BOILER 审中-公开
    具有一般锅炉的发电厂的低负载运行方法

    公开(公告)号:US20160032784A1

    公开(公告)日:2016-02-04

    申请号:US14807216

    申请日:2015-07-23

    Abstract: The once-through boiler includes a water supply and at least an economizer, an evaporator superheater. No valves are provided between the economizer, the evaporator and the superheater. The high-pressure turbine includes a control valve. The method for low load operation of a power plant with a once-through boiler and a high pressure turbine includes providing a parameter indicative of the stable operation of the once-through boiler in once-through operation, and on the basis of this parameter adjusting the control valve in order to regulate the pressure within the economizer and evaporator and/or adjusting the temperature of the water supplied to the economizer.

    Abstract translation: 直流式锅炉包括供水装置和至少节能器,蒸发器过热器。 在节能器,蒸发器和过热器之间没有设置阀。 高压涡轮机包括控制阀。 具有直流锅炉和高压汽轮机的发电厂的低负荷运行方法包括提供一次性运行中指示一次性锅炉的稳定运行的参数,并且基于该参数调整 控制阀,以便调节节能器和蒸发器内的压力和/或调节供应给节能器的水的温度。

Patent Agency Ranking