-
公开(公告)号:US20250003336A1
公开(公告)日:2025-01-02
申请号:US18342487
申请日:2023-06-27
Applicant: ARAMCO SERVICES COMPANY
Inventor: Yanhui Han , Rima T. AlFaraj , Khaqan Khan , Dung Phan , Chao Liu , Khalid Alruwaili , Murtadha J. AlTammar
IPC: E21B49/00
Abstract: A method for performing a borehole operation is disclosed. The method includes determining a characteristic diffusion time that corresponds to an undrained response period or a non-monotonic pore pressure dissipation phase of a porous medium surrounding a borehole, determining, based on a pre-determined failure criterion, a critical time of the borehole that corresponds to when a failure of the porous medium occurs within the characteristic diffusion time, identifying a failure region of the failure occurring at the critical time of the borehole, and performing, based on at least the identified failure region, the borehole operation.
-
公开(公告)号:US20220229950A1
公开(公告)日:2022-07-21
申请号:US17150142
申请日:2021-01-15
Applicant: ARAMCO SERVICES COMPANY
Inventor: Yanhui Han , Dung Phan , Khalid AlRuwaili
IPC: G06F30/20 , E21B47/005 , E21B49/00 , E21B47/007 , G01V99/00
Abstract: A method for evaluating an integrity of a liner disposed in a wellbore, that contacts a formation through a cement layer between the liner and the formation, includes computing a stress on a boundary of the liner by an iteration procedure that implements an analytical solution of stresses on a liner-cement interface and a cement-formation interface using the geometric data, performing numerical simulations using the computational numerical model to calculate a magnitude and distribution of stresses acting on the liner-cement interface and the cement-formation interface, performing numerical simulations with the actual in-situ stresses to replace the mean in-situ stress on the outer boundary of formation layer to calculate magnitude and distribution of stresses acting on the liner-cement and cement-formation interfaces using the calibrated computational mesh and applying the calculated stresses acting on the liner to a liner integrity evaluation model to determine an integrity of the liner at a plurality of stages of the wellbore.
-
公开(公告)号:US11940592B2
公开(公告)日:2024-03-26
申请号:US17150142
申请日:2021-01-15
Applicant: ARAMCO SERVICES COMPANY
Inventor: Yanhui Han , Dung Phan , Khalid AlRuwaili
IPC: G01V99/00 , E21B47/005 , E21B47/007 , E21B49/00
CPC classification number: G01V99/005 , E21B47/005 , E21B47/007 , E21B49/00 , E21B2200/20
Abstract: A method for evaluating an integrity of a liner disposed in a wellbore, that contacts a formation through a cement layer between the liner and the formation, includes computing a stress on a boundary of the liner by an iteration procedure that implements an analytical solution of stresses on a liner-cement interface and a cement-formation interface using the geometric data, performing numerical simulations using the computational numerical model to calculate a magnitude and distribution of stresses acting on the liner-cement interface and the cement-formation interface, performing numerical simulations with the actual in-situ stresses to replace the mean in-situ stress on the outer boundary of formation layer to calculate magnitude and distribution of stresses acting on the liner-cement and cement-formation interfaces using the calibrated computational mesh and applying the calculated stresses acting on the liner to a liner integrity evaluation model to determine an integrity of the liner at a plurality of stages of the wellbore.
-
-