Production of high titania slag from ilmenite
    3.
    发明授权
    Production of high titania slag from ilmenite 失效
    从钛铁矿生产高二氧化钛矿渣

    公开(公告)号:US06733561B2

    公开(公告)日:2004-05-11

    申请号:US10284636

    申请日:2002-10-31

    IPC分类号: C22B3412

    摘要: A process is provided for the production of titania rich slag from ilmenite. The ilmenite is fed together with carbonaceous reductant, and in the absence of fluxes, to the molten bath of a D.C. arc furnace. The molten bath of the furnace forms the anode and one or more electrodes in the roof of the furnace forms the cathode. A frozen lining is established and maintained between the refractory lining of the furnace and the molten bath and the process includes means to control the thickness of the frozen lining as well as the whole smelting process.

    摘要翻译: 提供了从钛铁矿生产富含二氧化钛的炉渣的方法。 将钛铁矿与碳质还原剂一起加入到没有助熔剂的直流电弧炉的熔池中。 炉的熔池形成阳极,炉顶部的一个或多个电极形成阴极。 在炉的耐火衬里和熔池之间建立并保持冷冻衬里,并且该方法包括控制冷冻衬里的厚度以及整个冶炼过程的手段。