-
公开(公告)号:US20230065286A1
公开(公告)日:2023-03-02
申请号:US18046819
申请日:2022-10-14
Applicant: Autodesk, Inc.
Inventor: Patrick Liam Colm Tierney , Abhijit Oak
Abstract: A method, apparatus, system, and computer program product generates construction metrics. Building means, methods, and limitations of construction for one or more companies are gathered in a computer. A digital building information model (BIM) is acquired. Fabrication and construction parameters are extracted from the BIM. Construction metrics (for the BIM) are generated by combining the building means, methods, and limitations with the extracted fabrication and construction parameters. The construction metrics are then visualized in a modeling application and/or used to output construction process documentation.
-
公开(公告)号:US11481526B2
公开(公告)日:2022-10-25
申请号:US15331212
申请日:2016-10-21
Applicant: Autodesk, Inc.
Inventor: Patrick Liam Colm Tierney , Abhijit Oak
IPC: G06Q50/08 , G06F30/13 , G06F9/445 , G06F111/02
Abstract: A method, apparatus, system, and computer program product generates construction metrics. Building means, methods, and limitations of construction for one or more companies are gathered in a computer. A digital building information model (BIM) is acquired. Fabrication and construction parameters are extracted from the BIM. Construction metrics (for the BIM) are generated by combining the building means, methods, and limitations with the extracted fabrication and construction parameters. The construction metrics are then visualized in a modeling application and/or used to output construction process documentation.
-
公开(公告)号:US20180113959A1
公开(公告)日:2018-04-26
申请号:US15331212
申请日:2016-10-21
Applicant: Autodesk, Inc.
Inventor: Patrick Liam Colm Tierney , Abhijit Oak
Abstract: A method, apparatus, system, and computer program product generates construction metrics. Building means, methods, and limitations of construction for one or more companies are gathered in a computer. A digital building information model (BIM) is acquired. Fabrication and construction parameters are extracted from the BIM. Construction metrics (for the BIM) are generated by combining the building means, methods, and limitations with the extracted fabrication and construction parameters. The construction metrics are then visualized in a modeling application and/or used to output construction process documentation.
-
-