-
公开(公告)号:US11815863B2
公开(公告)日:2023-11-14
申请号:US18171971
申请日:2023-02-21
Applicant: Autodesk, Inc.
CPC classification number: G05B13/048 , G05B13/0265 , G06N5/04 , G06N20/00 , E03B7/02 , E03B7/075
Abstract: A control mechanism scheduler for a water resource infrastructure receives operating data and disturbance data, the operating data describing infrastructure components of the water resource infrastructure, the disturbance data comprising a disturbance signal describing a disturbance expected to disturb the water resource infrastructure. The control mechanism scheduler generates classes for disturbance signals, generates simulations of the water resource infrastructure, and generates schedules of setpoints for control mechanisms actuable to control the infrastructure components of the water resource infrastructure in accordance with approaching a predetermined objective.
-
公开(公告)号:US11586163B2
公开(公告)日:2023-02-21
申请号:US16620421
申请日:2018-06-08
Applicant: Autodesk, Inc.
Abstract: A control mechanism scheduler for a water resource infrastructure receives operating data and disturbance data, the operating data describing infrastructure components of the water resource infrastructure, the disturbance data comprising a disturbance signal describing a disturbance expected to disturb the water resource infrastructure. The control mechanism scheduler generates classes for disturbance signals, generates simulations of the water resource infrastructure, and generates schedules of setpoints for control mechanisms actuable to control the infrastructure components of the water resource infrastructure in accordance with approaching a predetermined objective.
-
公开(公告)号:US20240085870A1
公开(公告)日:2024-03-14
申请号:US18509091
申请日:2023-11-14
Applicant: Autodesk, Inc.
CPC classification number: G05B13/048 , G05B13/0265 , G06N5/04 , G06N20/00 , E03B7/02
Abstract: A system and method control a water resource infrastructure (WRI). The WRI has infrastructure components that are actuatable to cause a change to the WRI. A monitoring system has sensors that collect operating data that describes a state of the infrastructure components. A disturbance data provider provides disturbance data that may be expected to have an impact on operational parameters of the infrastructure components. A control mechanism scheduler receives the disturbance data and the operating data, trains to generate a schedule of setpoints for a control system in accordance with approaching a predetermined objective, and retrieves and outputs the schedule of setpoints in response to receiving real-time operational data. A control system receives the schedule of setpoints controls the infrastructure components based thereon.
-
公开(公告)号:US20230205150A1
公开(公告)日:2023-06-29
申请号:US18171971
申请日:2023-02-21
Applicant: Autodesk, Inc.
CPC classification number: G05B13/048 , G06N20/00 , G05B13/0265 , G06N5/04 , E03B7/02
Abstract: A control mechanism scheduler for a water resource infrastructure receives operating data and disturbance data, the operating data describing infrastructure components of the water resource infrastructure, the disturbance data comprising a disturbance signal describing a disturbance expected to disturb the water resource infrastructure. The control mechanism scheduler generates classes for disturbance signals, generates simulations of the water resource infrastructure, and generates schedules of setpoints for control mechanisms actuable to control the infrastructure components of the water resource infrastructure in accordance with approaching a predetermined objective.
-
-
-