-
公开(公告)号:US12099346B1
公开(公告)日:2024-09-24
申请号:US18648438
申请日:2024-04-28
Applicant: Beijing Institute of Technology
Inventor: Bin Xin , Yingmei He , Sai Lu , Fang Deng , Qing Wang , Mengjie Jing , Jiwei He
IPC: G05B13/04 , G05B13/02 , G05B19/418
CPC classification number: G05B19/41845 , G05B13/0265 , G05B13/04
Abstract: Disclosed is a large-scale dynamic double-effect scheduling method for a flexible job shop based on genetic programming (GP). In a GP implementation process of the present disclosure, in addition to features related to workpieces, processing robots and automated guided vehicles (AGVs), such as processing time of working procedures and buffer area waiting time, features of a ratio of processing time to transfer time and a ratio of processing energy consumption to transfer energy consumption are also added in a terminal set to cause job shop environment features to be more comprehensively applied to a scheduling rule design, thereby automatically designing a more consistent and accurate scheduling rule. A double-effect scheduling rule of the present disclosure overcomes the shortcomings of slow convergence speed, difficulty in rapid corresponding changes and unfit scheduling rules, and can quickly produce a more efficient and energy-saving production scheduling scheme.