公开(公告)号:US10773907B2
公开(公告)日:2020-09-15
申请号:US16578158
申请日:2019-09-20
Inventor: Lairong Yin , Juan Huang , Shuo Cai , Peng Xu , Lin Hu , Xuejun Peng , Anwei Jiang
Abstract: The present invention discloses a method for operating a multi-bar linkage mechanism based conveyor. Stretching the mechanism based conveyor comprises: an automatic control system is started to control a first two-drum winch, a second two-drum winch, and hydraulic cylinders in a multi-bar linkage mechanism based conveyor boom to operate together until the mechanism enters an operating state, and the first two-drum winch, the second two-drum winch, and the hydraulic cylinders in the multi-bar linkage mechanism based conveyor boom stop operating. Then, the angle of the multi-bar linkage mechanism based conveyor boom can be adjusted by controlling the operation of the second two-drum winch. Retracting the mechanism based conveyor comprises: the automatic control system is started to control the first two-drum winch, the second two-drum winch, and the hydraulic cylinders in the multi-bar linkage mechanism based conveyor boom to operate together until the mechanism enters a non-operating state.
-
公开(公告)号:US11840817B2
公开(公告)日:2023-12-12
申请号:US17846847
申请日:2022-06-22
Applicant: CHANGSHA UNIVERSITY OF SCIENCE AND TECHNOLOGY , RAILWAY NO. 5 BUREAU GROUP FIRST ENGINEERING CO. LTD.
Inventor: Zhongchu Tian , Ye Dai , Yu Tang , Tao Peng , Binyang Ding , Pei Cong , Xuejun Peng , Yuman Luo , Yali Gu , Chaohua Luo , Hui Cao , Yunlong Liu , Tao Ling
IPC: E02D19/04
CPC classification number: E02D19/04
Abstract: A method for constructing a steel sheet pile cofferdam is provided, including: step S1, determining a construction area of the steel sheet pile cofferdam; step S2, piling steel casings, and welding guide frame brackets to the steel casings, the guide frame brackets are connected with a guide frame and limiting clamp plates; step S3, piling steel sheet piles by relying on the guide frame; step S4, pouring subsealing concrete at a bottom of the steel sheet pile cofferdam; step S5, arranging purlins and internal supports within the steel sheet pile cofferdam; step S6, perform a secondary subsealing at the bottom of the steel sheet pile cofferdam; step S7, pumping water within the steel sheet pile cofferdam through a pump and pouring to form a bearing platform on the subsealing concrete; step S8, removing the steel sheet pile cofferdam after the bearing platform is formed.
-