Three-Dimensional Ventilation Method And System For Mining By 110 Construction Method In Coal And Gas Outburst Mines

    公开(公告)号:US20230175398A1

    公开(公告)日:2023-06-08

    申请号:US17922066

    申请日:2021-04-30

    IPC分类号: E21F1/00 E21F7/00

    CPC分类号: E21F1/006 E21F7/00

    摘要: The present disclosure relates to the technical field of mine ventilation, and in particular, to a three-dimensional ventilation method and system for mining by 110 construction method in coal and gas outburst mines. The three-dimensional ventilation method comprises: constructing a first process roadway and/or a second process roadway before stopping the working face; forming a first roof-cutting and roadway retaining section by a part of the working face track gate located in the goaf, and/or forming a second roof-cutting and roadway retaining section by a part of the working face transport gate located in the goaf during the stopping process of the working face, so that the air inlet of the first roof-cutting and roadway retaining section enters the gas drainage air return roadway through the first process roadway to form return air, and/or the inlet air of the second roof-cutting and roadway retaining section enters the gas drainage air inlet roadway through the second process roadway to form return air, the three-dimensional ventilation system is constructed by using the gas drainage air inlet roadway and the gas drainage air return roadway, during the conversion from the 121 construction method to the 110 construction method, a complete ventilation system can be formed in the roadway retaining section, real-time monitoring of the roadway retaining section can be carried while eliminating harmful gas accumulation in the retaining section.

    Mining Method Without Coal Pillars With Roof-Cutting And Roadway Retaining

    公开(公告)号:US20230258083A1

    公开(公告)日:2023-08-17

    申请号:US17922128

    申请日:2021-04-30

    IPC分类号: E21C41/18 E21F1/00 E21F16/00

    CPC分类号: E21C41/18 E21F1/00 E21F16/00

    摘要: The present disclosure relates to the technical field of coal mining, and in particular, to a mining method without coal pillars with roof-cutting and roadway retaining, comprising: constructing a gas drainage roadway and eliminating outbursts in a working face transport gate area and a working face track gate area on opposite sides of a first mining working face; constructing the working face track gate, the working face transport gate, a first process roadway and a second process roadway, one end of the working face track gate is communicated with an air return roadway, the other end is communicated with the gas drainage roadway by the first process roadway, one end of the working face track gate is communicated with the air return roadway, the other end is communicated with the gas drainage roadway by the second process roadway; stoping the working face, forming an roadway retaining section, the roadway retaining section is communicated with the gas drainage roadway by the first process roadway and the second process roadway, forming a ventilation system. Make full use of the existing gas drainage roadway to meet the roadway layout requirements using the 110 construction method, increasing the use function of the roadway and increasing the reuse rate of the roadway, reducing the roadway engineering quantity before production, shortening the construction period and reduce the cost.