Climbing equipment and climbing method for the construction of a building

    公开(公告)号:US10036170B2

    公开(公告)日:2018-07-31

    申请号:US15581465

    申请日:2017-04-28

    申请人: DESPE S.p.A.

    IPC分类号: E04G3/28 E04G3/20 E04G11/28

    摘要: Climbing equipment for the construction of a building, including a scaffold that at least partially surrounds the perimeter of a building floor and is provided with a walkable surface. The climbing equipment includes a traction device comprising a first portion integral with the scaffold, and a second portion connected to the first portion. The first portion includes a first coupling element adapted to grip a first coupling portion of the building, and the second portion includes a second coupling element, arranged at a different level than the first coupling element, and adapted to grip a second coupling portion of the building. The climbing equipment further comprises a moving system. When the first coupling element is released from the respective coupling portion, the moving system performs a relative movement between the first portion and said second portion of the traction device, so as to move the scaffold by a predetermined amount.

    METHOD FOR DEMOLISHING A BUILDING
    2.
    发明申请
    METHOD FOR DEMOLISHING A BUILDING 审中-公开
    拆解建筑物的方法

    公开(公告)号:US20170002578A1

    公开(公告)日:2017-01-05

    申请号:US15265097

    申请日:2016-09-14

    申请人: Despe S.p.A.

    摘要: A method for demolishing a building, where the building comprises a building base placed in proximity of a ground, or placed on the ground, and an opposite building top or temporary building top arranged away from the building base, as well as building floors. The equipment used in the method includes a platform adapted to be positioned against the top of the building, avoiding ground support devices which extend from the platform to the base of the building or the ground surrounding the building. The platform includes at least one working scaffold adapted to be arranged along the periphery of the building and to face at least one floor of said building. The working scaffold is supported, hung, on the platform so that it descends along the side wall of the building to border the works for demolishing the building.

    摘要翻译: 一种拆除建筑物的方法,其中建筑物包括放置在地面附近或放置在地面上的建筑物基座,以及布置在远离建筑物基座的建筑物顶部或临时建筑物顶部以及建筑物地板。 该方法中使用的设备包括适于抵靠建筑物顶部定位的平台,避免了从平台延伸到建筑物的基部或围绕建筑物的地面的地面支撑装置。 该平台包括至少一个工作脚手架,其适于沿着建筑物的周边布置并面向所述建筑物的至少一个楼层。 工作脚手架支撑,挂在平台上,沿着建筑物的侧墙下降,与工程拆除建筑物。

    CLIMBING EQUIPMENT AND CLIMBING METHOD FOR THE CONSTRUCTION OF A BUILDING

    公开(公告)号:US20180266124A1

    公开(公告)日:2018-09-20

    申请号:US15982574

    申请日:2018-05-17

    申请人: Despe S.p.A.

    IPC分类号: E04G3/28 E04G11/28 E04G3/20

    摘要: Climbing equipment for the construction of a building, including a scaffold that at least partially surrounds the perimeter of a building floor and is provided with a walkable surface. The climbing equipment includes a traction device comprising a first portion integral with the scaffold, and a second portion connected to the first portion. The first portion includes a first coupling element adapted to grip a first coupling portion of the building, and the second portion includes a second coupling element, arranged at a different level than the first coupling element, and adapted to grip a second coupling portion of the building. The climbing equipment further comprises a moving system. When the first coupling element is released from the respective coupling portion, the moving system performs a relative movement between the first portion and said second portion of the traction device, so as to move the scaffold by a predetermined amount.

    CLIMBING EQUIPMENT AND CLIMBING METHOD FOR THE CONSTRUCTION OF A BUILDING

    公开(公告)号:US20170226757A1

    公开(公告)日:2017-08-10

    申请号:US15581465

    申请日:2017-04-28

    申请人: DESPE S.p.A.

    IPC分类号: E04G3/28 E04G3/20

    摘要: Climbing equipment for the construction of a building, including at least one scaffold that at least partially surrounds the perimeter of a building floor and is provided with a walkable surface. The climbing equipment includes a traction device comprising at least a first portion integral with the scaffold, and at least a second portion connected to the first portion. The first portion includes a first coupling element adapted to grip a first coupling portion of the building, and the second portion includes a second coupling element, arranged at a different level than the first coupling element, and adapted to grip a second coupling portion of the building. The climbing equipment further comprises a moving system. When the first coupling element is released from the respective coupling portion, the moving system performs a relative movement between the first portion and said second portion of the traction device, so as to move the scaffold by a predetermined amount.