-
公开(公告)号:US20120230771A1
公开(公告)日:2012-09-13
申请号:US13508613
申请日:2011-05-27
Applicant: E. Ray Farley , Benjamin Back
Inventor: E. Ray Farley , Benjamin Back
IPC: F16L1/024
Abstract: A pipeline insertion system (100) may include an insertion device (102) outside a tunnel that includes an insertion device frame (104) and a movable clamp device (106) in slidable engagement with the insertion device frame. A drive may cause the movable clamp device engaged with a pipeline to move between a first position (108) and a second position (110) along the frame. Inside the tunnel, the system may also include a plurality of support frames (118) remote from the insertion device and remote from each other which support the pipeline on bearings as the pipeline is pushed (or pulled) by the insertion device through the bores of a plurality of housing segments (122) mounted in the tunnel. A controller (126) is operative to control the drive and the movable clamp device responsive to transducers which measure pipeline slippage, thrust force, and clamping pressure.
Abstract translation: 管道插入系统(100)可以包括在隧道外部的插入装置(102),其包括插入装置框架(104)和与插入装置框架可滑动接合的可移动夹紧装置(106)。 驱动器可能导致与管道接合的可移动夹紧装置沿着框架在第一位置(108)和第二位置(110)之间移动。 在隧道内,系统还可以包括远离插入装置并且彼此远离的多个支撑框架(118),当支架被插入装置推动(或拉动)时,支撑管道在轴承上,通过孔的孔 安装在隧道中的多个壳体段(122)。 控制器(126)可操作以响应于测量管道滑动,推力和夹紧压力的换能器来控制驱动器和可动夹紧装置。
-
公开(公告)号:US08727666B2
公开(公告)日:2014-05-20
申请号:US13508613
申请日:2011-05-27
Applicant: E. Ray Farley , Benjamin Back
Inventor: E. Ray Farley , Benjamin Back
IPC: F16L1/028
Abstract: A pipeline insertion system (100) may include an insertion device (102) outside a tunnel that includes an insertion device frame (104) and a movable clamp device (106) in slidable engagement with the insertion device frame. A drive may cause the movable clamp device engaged with a pipeline to move between a first position (108) and a second position (110) along the frame. Inside the tunnel, the system may also include a plurality of support frames (118) remote from the insertion device and remote from each other which support the pipeline on bearings as the pipeline is pushed (or pulled) by the insertion device through the bores of a plurality of housing segments (122) mounted in the tunnel. A controller (126) is operative to control the drive and the movable clamp device responsive to transducers which measure pipeline slippage, thrust force, and clamping pressure.
Abstract translation: 管道插入系统(100)可以包括在隧道外部的插入装置(102),其包括插入装置框架(104)和与插入装置框架可滑动接合的可移动夹紧装置(106)。 驱动器可能导致与管道接合的可移动夹紧装置沿着框架在第一位置(108)和第二位置(110)之间移动。 在隧道内,系统还可以包括远离插入装置并且彼此远离的多个支撑框架(118),当支架被插入装置推动(或拉动)时,支撑管道在轴承上,通过孔的孔 安装在隧道中的多个壳体段(122)。 控制器(126)可操作以响应于测量管道滑动,推力和夹紧压力的换能器来控制驱动器和可动夹紧装置。
-