公开(公告)号:US12106237B2
公开(公告)日:2024-10-01
申请号:US17681836
申请日:2022-02-27
Applicant: GCP Applied Technologies Inc.
Inventor: Nathan A. Tregger , Mark F. Roberts , Jason Straka , Elise Berodier , Greg Austin , Robert Hoopes
IPC: G06Q10/06 , G06Q10/0631
CPC classification number: G06Q10/06311 , G06Q10/06313
Abstract: Described are a method and system for coordinating the delivery and placement of concrete loads at a job site, and more particularly to adjusting a set time value or value range of the concrete loads, thereby to facilitate finishing or other concrete placement activities. In exemplary embodiments, the adjustments can be made based on an assessment of previously placed concrete loads. The set time values or value ranges of the concrete can be monitored and adjusted to achieve desired properties during installation and/or in its hardened state.
-
公开(公告)号:US11295248B2
公开(公告)日:2022-04-05
申请号:US16941494
申请日:2020-07-28
Applicant: GCP Applied Technologies Inc.
Inventor: Nathan A. Tregger , Mark F. Roberts , Jason Straka , Elise Berodier , Greg Austin , Robert Hoopes
IPC: G06Q10/06
Abstract: Described are a method and system for coordinating the delivery and placement of concrete loads at a job site, and more particularly to adjusting a set time value or value range of the concrete loads, thereby to facilitate finishing or other concrete placement activities. In exemplary embodiments, the adjustments can be made based on an assessment of previously placed concrete loads. The set time values or value ranges of the concrete can be monitored and adjusted to achieve desired properties during installation and/or in its hardened state.
-
公开(公告)号:US20210035036A1
公开(公告)日:2021-02-04
申请号:US16941494
申请日:2020-07-28
Applicant: GCP Applied Technologies Inc.
Inventor: Nathan A. Tregger , Mark F. Roberts , Jason Straka , Elise Berodier , Greg Austin , Robert Hoopes
IPC: G06Q10/06
Abstract: Described are a method and system for coordinating the delivery and placement of concrete loads at a job site, and more particularly to adjusting a set time value or value range of the concrete loads, thereby to facilitate finishing or other concrete placement activities. In exemplary embodiments, the adjustments can be made based on an assessment of previously placed concrete loads. The set time values or value ranges of the concrete can be monitored and adjusted to achieve desired properties during installation and/or in its hardened state.
-
公开(公告)号:US11073017B2
公开(公告)日:2021-07-27
申请号:US16612393
申请日:2018-05-10
Applicant: GCP Applied Technologies Inc.
Inventor: Md Nasim Hyder , Robert A. Wiercinski , Jyoti Seth , Greg Austin , Christian A. Forgey , Sean Dsilva
Abstract: The present invention provides a multi-layer barrier assembly or device for post-installation injection of a resin, grout, or other fluid. The barrier device comprises first and second layers defining an intermediate open-matrix layer, and at least one injection conduit member in parallel orientation with respect to the first and second layers and having openings for injecting fluid into the intermediate open-matrix layer. The injection conduit may be located between and in parallel orientation with respect to the first and second layers, along an edge of the first and/or second layers, along an outer face of the first layer (if the first layer is a woven or nonwoven fabric), or at any combination of these locations, to enable fluid to be conveyed into the intermediate open-matrix layer. The invention also provides for use of a gel activator within the barrier device cavity, such as pre-installed on open-matrix structure which used for separating the first and second layers of the barrier device, such that a highly flowable injection fluid can be introduced into the device, and its gelation or hardening will be initiated or accelerated by the presence of the gel activator. This will allow for low power grout pumps to be used and facilitate the sealing of fine cracks in the surrounding concrete.
-
公开(公告)号:US20220180270A1
公开(公告)日:2022-06-09
申请号:US17681836
申请日:2022-02-27
Applicant: GCP Applied Technologies Inc.
Inventor: Nathan A. Tregger , Mark F. Roberts , Jason Straka , Elise Berodier , Greg Austin , Robert Hoopes
IPC: G06Q10/06
Abstract: Described are a method and system for coordinating the delivery and placement of concrete loads at a job site, and more particularly to adjusting a set time value or value range of the concrete loads, thereby to facilitate finishing or other concrete placement activities. In exemplary embodiments, the adjustments can be made based on an assessment of previously placed concrete loads. The set time values or value ranges of the concrete can be monitored and adjusted to achieve desired properties during installation and/or in its hardened state.
-
公开(公告)号:US20200232322A1
公开(公告)日:2020-07-23
申请号:US16612393
申请日:2018-05-10
Applicant: GCP Applied Technologies Inc.
Inventor: MD Nasim Hyder , Robert A. Wiercinski , Jyoti Seth , Greg Austin , Christian A. Forgey , Sean Dsilva
Abstract: The present invention provides a multi-layer barrier assembly or device for post-installation injection of a resin, grout, or other fluid fluid. The barrier device comprises first and second layers defining an intermediate open-matrix layer, and at least one injection conduit member in parallel orientation with respect to the first and second layers and having openings for injecting fluid into the intermediate open-matrix layer. The injection conduit may be located between and in parallel orientation with respect to the first and second layers, along an edge of the first and/or second layers, along an outer face of the first layer (if the first layer is a woven or nonwoven fabric), or at any combination of these locations, to enable fluid to be conveyed into the intermediate open-matrix layer. The invention also provides for use of a gel activator within the barrier device cavity, such as pre-installed on open-matrix structure which used for separating the first and second layers of the barrier device, such that a highly flowable injection fluid can be introduced into the device, and its gelation or hardening will be initiated or accelerated by the presence of the gel activator. This will allow for low power grout pumps to be used and facilitate the sealing of fine cracks in the surrounding concrete.
-
-
-
-
-