Abstract:
A system for extracting foreign matter in a gas turbine is provided. The system includes a variable bleed valve (VBV) disposed between a booster and a high pressure compressor configured to bleed at least a first flow from a core engine flow path into a bypass flow path to extract foreign particles. The system also includes a wedge structure disposed in the core engine flowpath proximate to the variable bleed valve and configured to allow the at least first flow into the bypass flow path through an extraction passage or at least a second flow through a recovery passage into the core engine flow path.
Abstract:
A system for extracting foreign matter in a gas turbine includes multiple variable bleed valve (VBV) doors disposed on the outer engine casing between a low pressure compressor and a high pressure compressor for bleeding a portion of flow from a core engine flow path into a bypass flow path. The system includes an outlet guide vane (OGV) assembly having multiple guide vanes disposed within the core flow path and multiple support struts positioned downstream from the multiple guide vanes. Each pairs of adjacent support struts comprises at least one VBV door therebetween and a section of the OGV assembly located at an upstream side of the fan hub frame before the each pairs of adjacent support struts. Each section of the OGV assembly includes a first side with one or more guide vanes with trimmed trailing edges configured for directing flow into the at least one VBV door.
Abstract:
A system for extracting foreign matter in a gas turbine includes multiple variable bleed valve (VBV) doors disposed on the outer engine casing between a low pressure compressor and a high pressure compressor for bleeding a portion of flow from a core engine flow path into a bypass flow path. The system includes an outlet guide vane (OGV) assembly having multiple guide vanes disposed within the core flow path and multiple support struts positioned downstream from the multiple guide vanes. Each pairs of adjacent support struts comprises at least one VBV door therebetween and a section of the OGV assembly located at an upstream side of the fan hub frame before the each pairs of adjacent support struts. Each section of the OGV assembly includes a first side with one or more guide vanes with trimmed trailing edges configured for directing flow into the at least one VBV door.