-
公开(公告)号:USD923654S1
公开(公告)日:2021-06-29
申请号:US29678982
申请日:2019-01-31
Applicant: General Electric Company
Designer: Michelle Mbeo , Andrew Day , Christopher D. Johnson
-
公开(公告)号:US11244259B2
公开(公告)日:2022-02-08
申请号:US16707822
申请日:2019-12-09
Applicant: General Electric Company
Inventor: Christopher D. Johnson , Kunter Seref Akbay , Onur Ilkin Dulgeroglu
Abstract: A system and method for use in managing and preparing for scheduled procedures that are characterized as being interdependent and variable. The disclosed method enables schedule risk management and provides a look-ahead capability along with process diagnostics to isolate specific assets and tasks that can be managed to reduce schedule risk. The method facilitates review of upcoming tasks by the process stakeholders for education as to where the schedule risks reside and in an emulation mode for review and improved scheduling going forward. Clinical workflow is integrated such that process stakeholders and assets are directed in such a way as to keep on, reduce delay risk or recover the schedule.
-
3.
公开(公告)号:US20190095851A1
公开(公告)日:2019-03-28
申请号:US16206447
申请日:2018-11-30
Applicant: General Electric Company
Inventor: Christopher D. Johnson , Kunter Seref Akbay , Onur Ilkin Dulgeroglu
Abstract: A system and method for use in managing and preparing for scheduled procedures that are characterized as being interdependent and variable. The disclosed method enables schedule risk management and provides a look-ahead capability along with process diagnostics to isolate specific assets and tasks that can be managed to reduce schedule risk. The method facilitates review of upcoming tasks by the process stakeholders for education as to where the schedule risks reside and in an emulation mode for review and improved scheduling going forward. Clinical workflow is integrated such that process stakeholders and assets are directed in such a way as to keep on, reduce delay risk or recover the schedule.
-
-