公开(公告)号:US10534328B2
公开(公告)日:2020-01-14
申请号:US15188537
申请日:2016-06-21
Applicant: General Electric Company
Inventor: Sanyaswara Rao Ganti , Michael James O'Connor , Christopher Joseph Vreeman , Awadesh Kumar Tiwari , Venkata Jogi Janaki Suresh Mandapaka , Gaurav Nair
Abstract: A system including a power plant having thermal generating units that operate according to multiple possible operating modes, which are differentiated by a unique operational or maintenance schedule. The system further includes a hardware processor and machine readable storage medium on which is stored instructions that cause the hardware processor to execute a process related to optimizing the operational or maintenance schedule during a selected operating period. The process may include: receiving the selected operating period; selecting competing operating modes for the power plant during the selected operating period according to a selection criteria; simulating the operation of the power plant during the selected operating period for each of the competing operating modes and deriving simulation results therefrom; evaluating each of the simulation results pursuant to a cost function and, based thereupon, designating at least one of the competing operating modes as an optimized operating mode.
-
公开(公告)号:US20170364043A1
公开(公告)日:2017-12-21
申请号:US15188537
申请日:2016-06-21
Applicant: General Electric Company
Inventor: Sanyaswara Rao Ganti , Michael James O'Connor , Christopher Joseph Vreeman , Awadesh Kumar Tiwari , Venkata Jogi Janaki Suresh Mandapaka , Gaurav Nair
CPC classification number: G05B13/048 , G05B15/02 , G05B17/02 , G05B2219/25419 , G05B2219/39361 , G06Q10/20
Abstract: A system including a power plant having thermal generating units that operate according to multiple possible operating modes, which are differentiated by a unique operational or maintenance schedule. The system further includes a hardware processor and machine readable storage medium on which is stored instructions that cause the hardware processor to execute a process related to optimizing the operational or maintenance schedule during a selected operating period. The process may include: receiving the selected operating period; selecting competing operating modes for the power plant during the selected operating period according to a selection criteria; simulating the operation of the power plant during the selected operating period for each of the competing operating modes and deriving simulation results therefrom; evaluating each of the simulation results pursuant to a cost function and, based thereupon, designating at least one of the competing operating modes as an optimized operating mode.
-