SYSTEMS AND METHODS FOR MANAGEMENT OF RISK IN INDUSTRIAL PLANTS
    1.
    发明申请
    SYSTEMS AND METHODS FOR MANAGEMENT OF RISK IN INDUSTRIAL PLANTS 有权
    用于管理工业厂房风险的系统和方法

    公开(公告)号:US20140156584A1

    公开(公告)日:2014-06-05

    申请号:US13691336

    申请日:2012-11-30

    CPC classification number: G06N5/048 G06Q10/06

    Abstract: A system includes a risk assessment system. The risk assessment system includes a risk calculation system configured to calculate a risk based on one or more static inputs and one or more dynamic inputs. The one or more dynamic inputs includes a location of a human resource, a mobile resource, or a combination thereof. The risk assessment system further includes a decision support system (DSS) configured to use the risk to derive one or more decisions based on the risk, the one or more static inputs, and the one or more dynamic inputs. The one or more decisions are configured to aid in operating an industrial facility.

    Abstract translation: 系统包括风险评估系统。 风险评估系统包括风险计算系统,该系统被配置为基于一个或多个静态输入和一个或多个动态输入来计算风险。 一个或多个动态输入包括人力资源的位置,移动资源或其组合。 所述风险评估系统还包括被配置为使用所述风险基于所述风险,所述一个或多个静态输入和所述一个或多个动态输入来导出一个或多个决策的决策支持系统(DSS)。 一个或多个决定被配置成有助于操作工业设施。

    Systems and methods for management of risk in industrial plants
    2.
    发明授权
    Systems and methods for management of risk in industrial plants 有权
    工业厂房风险管理系统和方法

    公开(公告)号:US09076106B2

    公开(公告)日:2015-07-07

    申请号:US13691336

    申请日:2012-11-30

    CPC classification number: G06N5/048 G06Q10/06

    Abstract: A system includes a risk assessment system. The risk assessment system includes a risk calculation system configured to calculate a risk based on one or more static inputs and one or more dynamic inputs. The one or more dynamic inputs includes a location of a human resource, a mobile resource, or a combination thereof. The risk assessment system further includes a decision support system (DSS) configured to use the risk to derive one or more decisions based on the risk, the one or more static inputs, and the one or more dynamic inputs. The one or more decisions are configured to aid in operating an industrial facility.

    Abstract translation: 系统包括风险评估系统。 风险评估系统包括风险计算系统,该系统被配置为基于一个或多个静态输入和一个或多个动态输入来计算风险。 一个或多个动态输入包括人力资源的位置,移动资源或其组合。 所述风险评估系统还包括被配置为使用所述风险基于所述风险,所述一个或多个静态输入和所述一个或多个动态输入来导出一个或多个决策的决策支持系统(DSS)。 一个或多个决定被配置成有助于操作工业设施。

Patent Agency Ranking