-
公开(公告)号:US20210206077A1
公开(公告)日:2021-07-08
申请号:US16075616
申请日:2017-07-27
Applicant: HEWLETT-PACKARD DEVELOPMENT COMPANY, L.P.
Inventor: Mike RODE , Brent EWALD , John GEILE , Daniil POPOV , Tristan DUDIK
IPC: B29C64/255 , B33Y30/00 , B29C64/205 , B22F12/50 , B28B1/00
Abstract: In some examples, a lid of a build material carriage of a three-dimensional (3D) printer can include a lid covering an opening of the build material carriage while the lid is in an engaged position, and a mechanism to keep the lid over the opening of the build material carriage while the lid is in the engaged position, where the lid uncovers the opening of the build material carriage when the build material carriage is moved to receive build material via the opening during a build material fill process such that the lid is in a disengaged position.
-
公开(公告)号:US20210206088A1
公开(公告)日:2021-07-08
申请号:US16075913
申请日:2017-04-21
Applicant: HEWLETT-PACKARD DEVELOPMENT COMPANY, L.P.
Inventor: Brent EWALD , Mike RODE , Tristan DUDIK , John GEILE
IPC: B29C64/329 , B29C64/245 , B33Y40/00 , B33Y30/00 , B33Y10/00
Abstract: A 3D print material shut-off apparatus includes a discharge opening isolator, disposed in a first region of a 3D printer and a print material hopper including a discharge opening at a bottom portion of the print material hopper to discharge a print material from the print material hopper in a second region of the 3D printer adjacent to the first region. The discharge opening isolator is to occlude the discharge opening of the print material hopper when the print material hopper is in the first region.
-
公开(公告)号:US20210206085A1
公开(公告)日:2021-07-08
申请号:US16075481
申请日:2017-06-28
Applicant: HEWLETT-PACKARD DEVELOPMENT COMPANY, L.P.
Inventor: Mike RODE , John GEILE , Haseeb YUSEF , Tristan DUDIK , Pierre J. KAISER , Sam SCOFIELD , Brent EWALD
IPC: B29C64/329 , B29C64/393 , B33Y30/00 , B33Y50/02 , B29C64/255 , B33Y40/00
Abstract: In one example, a refill control system to control the flow of powdered build material to a dispenser to periodically refill the dispenser with powdered build material. In one example, the refill control system includes a container to hold powered build material and a valve operable between a closed position to block a flow of powdered build material from the container to the dispenser and an open position to not block the flow of powdered build material from the container to the dispenser. The container is movable from a first position to a second position to connect the container to the dispenser and from the second position to the first position to disconnect the container from the dispenser.
-
-