Control Rule Generating Device, Result Reflecting Device and Control Rule Generating System

    公开(公告)号:US20230376018A1

    公开(公告)日:2023-11-23

    申请号:US18134238

    申请日:2023-04-13

    Applicant: Hitachi, Ltd.

    CPC classification number: G05B19/41865 G05B2219/32301

    Abstract: To ensure robustness to a production variation. A control rule generating device for generating a control rule of a production facility including at least a production device, includes: a rule storage unit configured to store candidates of a dispatching rule serving as the control rule usable for each of the production facility and a control program for implementing the dispatching rule; and a control rule assigning unit configured to specify, for each of the production facility, the dispatching rule corresponding to a predetermined production plan among the candidates of the dispatching rule as the dispatching rule to be applied, and transmit the control program corresponding to the specified dispatching rule to the production facility.

    DISTRIBUTED PRODUCTION PLANNING AND INSTRUCTION APPARATUS AND DISTRIBUTED PRODUCTION PLANNING AND INSTRUCTION SYSTEM

    公开(公告)号:US20220342399A1

    公开(公告)日:2022-10-27

    申请号:US17712249

    申请日:2022-04-04

    Applicant: HITACHI, LTD.

    Abstract: The apparatus includes: a storage unit configured to store a production instruction serving as an operation instruction for a production element including a production facility of a factory, a production resource, and an operator, production state information including an occurrence state of an abnormality of the production element, and facility-process relation information for identifying, for each process to be performed by the production element, another production element capable of alternatively performing the process; a planning change necessity determination unit configured to, when an abnormality in execution of the production instruction occurs in the production element, determine that planning change is unnecessary when the production instruction can be complied in consideration of a stop period of the production element that is caused by the abnormality; a distributed planning range calculation unit configured to include the another alternative production element in a re-planning target range; and a distributed planning generation unit.

    PRODUCTION LINE CONFIGURATION CHANGE SYSTEM AND PRODUCTION LINE CONFIGURATION CHANGE METHOD

    公开(公告)号:US20200159194A1

    公开(公告)日:2020-05-21

    申请号:US16321476

    申请日:2018-03-05

    Applicant: Hitachi, Ltd.

    Abstract: The production line configuration change system includes: an error information storage unit that stores information of an error which occurs in equipment on a production line; a work information storage unit that stores work contents required for manufacturing a product; an equipment information storage unit that stores constraint information of a tool mountable on the equipment; a production line configuration information storage unit that, in order of manufacturing processes of the product, stores a work content, work assignment equipment, a tool mounted on the equipment, and a process tact time in each of the manufacturing processes; and a production line configuration calculation unit that is activated immediately after the error occurs, prepares a change plan of assigning a work assigned to the equipment in which the error occurs to the equipment before or after the process or another equipment of the identical process and calculates a provisional production line configuration.

    Work Improvement Support Apparatus, and Work Improvement Support System

    公开(公告)号:US20220092509A1

    公开(公告)日:2022-03-24

    申请号:US17210775

    申请日:2021-03-24

    Applicant: Hitachi, Ltd.

    Abstract: What is provided includes a storage unit configured to store a production result, a production plan and user information for each manufacture manufactured in a manufacturing site, an improvement target extraction unit configured to analyze a combination of the production result and the production plan and extract an element which becomes a target to be improved, an improvement measure estimation unit configured to estimate an improvement measure effective for the element which becomes the target to be improved from an analysis result of the production result and the production plan, and an analysis result generation unit configured to specify predetermined layout using attribute information included in the user information and generate a screen which provides the target to be improved and an improvement measure to a user in accordance with the layout.

    Work Entrustment Support System and Method Therefor

    公开(公告)号:US20180293531A1

    公开(公告)日:2018-10-11

    申请号:US15934434

    申请日:2018-03-23

    Applicant: Hitachi, Ltd.

    Abstract: Even if there are a plurality of items regarding work, a resource of a work trustee can be evaluated, and thus work entrustment is supported. A work entrustment support system includes a storage unit in which resource information in which an item of which work can be performed by a work trustee is correlated with the work trustee is stored, a work sequence generation unit that generates work schedules on the basis of design information, a priority key setting unit that stores information regarding the priority of each of a plurality of items regarding work in the storage unit, a rank value computation unit that evaluates the resource information stored in the storage unit for each of the work schedules generated by the work sequence generation unit on the basis of the information regarding the priority stored by the priority key setting unit, and a display unit that displays a work trustee according to a rank based on evaluation in the rank value computation unit

Patent Agency Ranking