Automobile manufacturing line input order planning apparatus
    1.
    发明授权
    Automobile manufacturing line input order planning apparatus 有权
    汽车生产线输入订单策划设备

    公开(公告)号:US07577485B2

    公开(公告)日:2009-08-18

    申请号:US10507520

    申请日:2003-02-27

    IPC分类号: G06F19/00

    摘要: The invention is intended to provide a building sequence planning system for an automobile production line, which can prepare an efficient building sequence. The system comprises an input unit (1) for inputting information of vehicles to be manufactured, a processing unit (3) for deciding an optimum building sequence based on the vehicle information inputted through the input unit (1), and an output unit (5) for externally outputting a building sequence schedule decided by the processing unit (3). The processing unit (3) prepares a vehicle building sequence, determines a degree of dissatisfaction of the prepared building sequence, as a penalty value, in accordance with restriction conditions which are inputted through the input unit (1) and are imposed when building the vehicles into work, and decides a building sequence with a minimum penalty by preparing a plurality of building sequences and determining the penalty value for each building sequence with respect to the restriction conditions.

    摘要翻译: 本发明旨在提供一种用于汽车生产线的建筑物顺序规划系统,其可以制备有效的建筑物序列。 该系统包括用于输入要制造的车辆的信息的输入单元(1),用于基于通过输入单元(1)输入的车辆信息来确定最佳构建顺序的处理单元(3),以及输出单元 ),用于从外部输出由处理单元(3)确定的建筑物序列调度。 处理单元(3)根据通过输入单元(1)输入并在构建车辆时施加的限制条件,准备车辆建筑序列,确定准备建筑物序列的不满意度作为惩罚值 并且通过准备多个构建序列并且针对限制条件确定每个构建序列的惩罚值来决定具有最小惩罚的构建序列。

    Automobile manufacturing line input order planning apparatus
    2.
    发明申请
    Automobile manufacturing line input order planning apparatus 有权
    汽车生产线输入订单策划设备

    公开(公告)号:US20050182505A1

    公开(公告)日:2005-08-18

    申请号:US10507520

    申请日:2003-02-27

    摘要: The invention is intended to provide a building sequence planning system for an automobile production line, which can prepare an efficient building sequence. The system comprises an input unit (1) for inputting information of vehicles to be manufactured, a processing unit (3) for deciding an optimum building sequence based on the vehicle information inputted through the input unit (1), and an output unit (5) for externally outputting a building sequence schedule decided by the processing unit (3). The processing unit (3) prepares a vehicle building sequence, determines a degree of dissatisfaction of the prepared building sequence, as a penalty value, in accordance with restriction conditions which are inputted through the input unit (1) and are imposed when building the vehicles into work, and decides a building sequence with a minimum penalty by preparing a plurality of building sequences and determining the penalty value for each building sequence with respect to the restriction conditions.

    摘要翻译: 本发明旨在提供一种用于汽车生产线的建筑物顺序规划系统,其可以制备有效的建筑物序列。 该系统包括用于输入要制造的车辆的信息的输入单元(1),用于基于通过输入单元(1)输入的车辆信息来确定最佳构建顺序的处理单元(3),以及输出单元 ),用于从外部输出由处理单元(3)确定的建筑物序列调度。 处理单元(3)根据通过输入单元(1)输入并在构建车辆时施加的限制条件,准备车辆建筑序列,确定准备建筑物序列的不满意度作为惩罚值 并且通过准备多个构建序列并且针对限制条件确定每个构建序列的惩罚值来决定具有最小惩罚的构建序列。