Staged automated validation of work packets inputs and deliverables in a software factory
    4.
    发明授权
    Staged automated validation of work packets inputs and deliverables in a software factory 失效
    在软件工厂中对工作包输入和可交付成果进行分阶段自动验证

    公开(公告)号:US08667469B2

    公开(公告)日:2014-03-04

    申请号:US12129304

    申请日:2008-05-29

    IPC分类号: G06F9/44

    CPC分类号: G06F8/61 G06F8/36 G06Q10/06

    摘要: A method, system, and computer-readable medium for staged validation of work packets within a software factory are presented. In one embodiment, the method includes creating a preliminary work packet. A validation constraint is appended to the preliminary work packet to create a constrained work packet. The constrained work packet is submitted to the software factory, within which the validation constraint is validated at different stages to confirm that the validation constraint is proper for the constrained work packet. If a validation result fails to meet all requirements of the validation constraint at each stage, the validation constraint is resolved, and the constrained work packet is re-submitted at that stage.

    摘要翻译: 提出了一种用于软件工厂内工作包分阶段验证的方法,系统和计算机可读介质。 在一个实施例中,该方法包括创建初步工作包。 验证约束附加到初步工作包以创建受约束的工作包。 受约束的工作包被提交给软件工厂,其中验证约束在不同阶段被验证,以确认验证约束适用于约束工作包。 如果验证结果不能满足每个阶段的验证约束的所有要求,则解决验证约束,并且在该阶段重新提交约束的工作包。

    Determining competence levels of teams working within a software
    5.
    发明授权
    Determining competence levels of teams working within a software 失效
    确定在软件中工作的团队的能力水平

    公开(公告)号:US08595044B2

    公开(公告)日:2013-11-26

    申请号:US12129438

    申请日:2008-05-29

    IPC分类号: G06Q10/00

    CPC分类号: G06F8/70 G06Q10/06

    摘要: A method, system, and computer-readable medium for determining competence levels of factory teams are presented. In a preferred embodiment, the method includes the steps of: creating a template for an initial work packet, wherein the initial work packet is a self-contained work unit that is assembled within the software factory; creating a partially instantiated work packet by populating the template with details that describe pre-conditions and post-conditions necessary to execute the work packet; provisionally selecting a human team to complete coding of the partially instantiated work packet to create a final work packet; determining whether the human team is competent to create the final work packet; and in response to determining that the human team is competent to create the final work packet, ordering the human team to create the final work packet within the software factory.

    摘要翻译: 提出了一种用于确定工厂团队能力水平的方法,系统和计算机可读介质。 在优选实施例中,该方法包括以下步骤:为初始工作包创建模板,其中初始工作包是组装在软件工厂内的独立工作单元; 通过用描述执行工作包所需的前提条件和后置条件的细节填充模板来创建部分实例化的工作包; 临时选择人类团队来完成部分实例化的工作包的编码以创建最终的工作包; 确定人力队是否有能力创建最终的工作包; 并且响应于确定人类团队有能力创建最终的工作包,命令人类团队在软件工厂内创建最终的工作包。

    Configuring design centers, assembly lines and job shops of a global delivery network into “on demand” factories
    6.
    发明授权
    Configuring design centers, assembly lines and job shops of a global delivery network into “on demand” factories 失效
    将全球交付网络的设计中心,装配线和作业车间配置为“按需”工厂

    公开(公告)号:US08527329B2

    公开(公告)日:2013-09-03

    申请号:US12173388

    申请日:2008-07-15

    IPC分类号: G06Q10/00

    CPC分类号: G06Q10/06

    摘要: A method, system and computer-readable medium for utilizing the design centers, assembly line and job shops of a global delivery network across multiple software factories are presented. Pre-qualified factory organizational units in a software factory are identified. Identified qualified factory organizational units, including design centers, assembly lines and job shops, are matched to customer requirements. If the identified qualified factory organizational units are available, then they are load balanced and deployed to create software deliverables to the customer.

    摘要翻译: 提出了一种方法,系统和计算机可读介质,用于跨多个软件工厂利用全球传送网络的设计中心,装配线和作业车间。 确定了软件工厂的合格工厂组织单位。 确定合格的工厂组织单位,包括设计中心,装配线和工作车间,符合客户要求。 如果确定的合格的工厂组织单位可用,则对其进行负载平衡和部署,以向客户创建软件可交付成果。

    STAGED AUTOMATED VALIDATION OF WORK PACKETS INPUTS AND DELIVERABLES IN A SOFTWARE FACTORY
    9.
    发明申请
    STAGED AUTOMATED VALIDATION OF WORK PACKETS INPUTS AND DELIVERABLES IN A SOFTWARE FACTORY 失效
    工厂包装盒自动验证软件工厂中的输入和输出

    公开(公告)号:US20090300586A1

    公开(公告)日:2009-12-03

    申请号:US12129304

    申请日:2008-05-29

    IPC分类号: G06F9/44

    CPC分类号: G06F8/61 G06F8/36 G06Q10/06

    摘要: A method, system, and computer-readable medium for staged validation of work packets within a software factory are presented. In one embodiment, the method includes creating a preliminary work packet. A validation constraint is appended to the preliminary work packet to create a constrained work packet. The constrained work packet is submitted to the software factory, within which the validation constraint is validated at different stages to confirm that the validation constraint is proper for the constrained work packet. If a validation result fails to meet all requirements of the validation constraint at each stage, the validation constraint is resolved, and the constrained work packet is re-submitted at that stage.

    摘要翻译: 提出了一种用于软件工厂内工作包分阶段验证的方法,系统和计算机可读介质。 在一个实施例中,该方法包括创建初步工作包。 验证约束附加到初步工作包以创建受约束的工作包。 受约束的工作包被提交给软件工厂,其中验证约束在不同阶段被验证,以确认验证约束适用于约束工作包。 如果验证结果不能满足每个阶段的验证约束的所有要求,则解决验证约束,并且在该阶段重新提交约束的工作包。