-
公开(公告)号:US5118220A
公开(公告)日:1992-06-02
申请号:US465251
申请日:1990-08-08
申请人: Kihachior Furumi , Joji Nakamura
发明人: Kihachior Furumi , Joji Nakamura
CPC分类号: E21D9/001 , E21D13/00 , E21D9/008 , E21D9/0671 , E21D9/087 , E21D9/0873
摘要: A method of forming an underground cavern aiming at forming an underground cavern of a large scale at a very deep place in soft ground and soft rock layers safely and economically, and a tunneling machine suitable for use in carrying out the method. This method of forming an underground cavern consists of the steps of forming a ground reinforcing zone around a portion intended to be hollowed out before froming an underground cavern to be built, and then excavating the inside surrounded by the ground reinforcing zone. Further, the above-mentioned tunneling machine comprises a ring-shaped body having a first ring, a second ring, and a third ring; a boring device mounted between the second ring and propelling jacks for boring a plurality of holes extending radially from the inner surface of the tunnel into the ground; and a reinforcing material filling device mounted also between the second ring and the propelling jacks for filling a reinforcing material and a grout into each of the holes.
摘要翻译: PCT No.PCT / JP89 / 00602 Sec。 371日期1990年8月8日第 102(e)日期1990年8月8日PCT提交1989年6月15日PCT公布。 出版物WO89 / 日期:1989年12月28日。一种形成地下洞穴的方法,其目的是安全,经济地在软地层和软岩层中的非常深的地方形成大规模的地下洞穴,以及适用于执行的隧道机 方法。 这种形成地下洞穴的方法包括以下步骤:在要从建筑的地下洞穴开始之前,在要被挖空的部分周围形成地面加固区域,然后挖掘由地面加固区域包围的内部。 此外,上述隧道掘进机包括具有第一环,第二环和第三环的环形主体; 安装在第二环和推进千斤顶之间的钻孔装置,用于钻出从隧道的内表面径向延伸到地面中的多个孔; 以及还安装在第二环和推进千斤顶之间的加强材料填充装置,用于将增强材料和灌浆填充到每个孔中。