公开(公告)号:US20230143733A1
公开(公告)日:2023-05-11
申请号:US17918372
申请日:2021-04-02
Applicant: Komatsu Ltd.
Inventor: Yoshiyuki Onishi , Mitsuhiro Aoki , Masahiro Kurihara , Kenjiro Shimada , Toyohito Uchizono
Abstract: In a construction method using an excavator that is controlled by manual operation, and an excavator that includes an automatic working-equipment control unit automatically controlling second working equipment on the basis of at least one of a current terrain and a designed terrain of a construction range in a construction site, and a tooth-edge position of the second working equipment, a progress rate that indicates a volume of soil having been excavated by the excavator to a target volume of soil to be excavated by the excavator in the construction range is calculated, and when the progress rate is equal to or larger than a threshold, the excavator stops construction of the construction range, and the excavator takes over the construction of the construction range, from the excavator.