-
1.
公开(公告)号:US11860757B2
公开(公告)日:2024-01-02
申请号:US17358620
申请日:2021-06-25
CPC分类号: G06F11/3409 , G06F11/3006 , G06F11/3075 , G06F11/328
摘要: A method for generating an output for performance impact assessment of a change includes determining changes associated with a first managed computer system where corresponding change records includes a respective change time-stamp, determining performance values for a performance metric for predetermined times and associating respective performance time-stamps, selecting one of the changes wherein the selected change has a change time-stamp, identifying first performance values with performance time-stamps that are prior in time to change time-stamp and associating them with a before-change category, identifying second performance values with performance time-stamps that are later in time relative to the change time-stamp and associating them with an after-change category, and generating an output with the first and second performance values (in a tabular or common timeline format) with the first performance values being distinguishable from the second performance values to thereby allow the user to determine before/after performance impact of the selected change.
-
2.
公开(公告)号:US20220114071A1
公开(公告)日:2022-04-14
申请号:US17358620
申请日:2021-06-25
摘要: A method for generating an output for performance impact assessment of a change includes determining changes associated with a first managed computer system where corresponding change records includes a respective change time-stamp, determining performance values for a performance metric for predetermined times and associating respective performance time-stamps, selecting one of the changes wherein the selected change has a change time-stamp, identifying first performance values with performance time-stamps that are prior in time to change time-stamp and associating them with a before-change category, identifying second performance values with performance time-stamps that are later in time relative to the change time-stamp and associating them with an after-change category, and generating an output with the first and second performance values (in a tabular or common timeline format) with the first performance values being distinguishable from the second performance values to thereby allow the user to determine before/after performance impact of the selected change.
-
公开(公告)号:US11042579B2
公开(公告)日:2021-06-22
申请号:US15629189
申请日:2017-06-21
IPC分类号: G06F16/33 , G06F16/242 , G06F16/951 , G06F16/332 , G06F16/903 , G06F40/247 , G06F40/295
摘要: A method includes associating, for each one of a plurality of answer definitions, at least one or more pattern-form questions, wherein each answer definition has an associated jump target that defines a respective entry point into the workspace analytics system to provide information responsive to the associated one or more pattern-form questions. The method further includes receiving a user input including capturing input text defining a natural language user query, matching the received input text to one of the pattern-form questions thereby selecting the jump target associated with the matched pattern-form question, and generating a response to the natural language user query by retrieving information from the workspace analytics system by referencing a link based on the selected jump target and zero or more parameters values.
-
4.
公开(公告)号:US20240281355A1
公开(公告)日:2024-08-22
申请号:US18515991
申请日:2023-11-21
CPC分类号: G06F11/3409 , G06F11/3006 , G06F11/3075 , G06F11/328
摘要: A method for generating an output for performance impact assessment of a change includes determining changes associated with a first managed computer system where corresponding change records includes a respective change time-stamp, determining performance values for a performance metric for predetermined times and associating respective performance time-stamps, selecting one of the changes wherein the selected change has a change time-stamp, identifying first performance values with performance time-stamps that are prior in time to change time-stamp and associating them with a before-change category, identifying second performance values with performance time-stamps that are later in time relative to the change time-stamp and associating them with an after-change category, and generating an output with the first and second performance values (in a tabular or common timeline format) with the first performance values being distinguishable from the second performance values to thereby allow the user to determine before/after performance impact of the selected change.
-
-
-