Basin-to reservoir modeling
    1.
    发明授权
    Basin-to reservoir modeling 有权
    盆地 - 水库模拟

    公开(公告)号:US09188699B2

    公开(公告)日:2015-11-17

    申请号:US14368363

    申请日:2013-10-15

    CPC classification number: G01V99/005 G06F17/10 G06T17/05

    Abstract: Systems and methods for basin to reservoir modeling to identify any hi-grade drilling targets based on the linking of static and dynamic reservoir rock and fluid properties. Static, present-day, reservoir and field scale description grids or unstructured meshes are transformed into dynamic (through time) simulation grids or unstructured meshes that can subsequently be used for input to dynamic calculators. Basin modeling may be performed at the reservoir scale, providing a link between present-day and the historical process that acted on the rocks and fluids.

    Abstract translation: 基于静态和动态储层岩石和流体性质的连接的盆地到油藏建模的系统和方法,以识别任何高级钻井目标。 静态,现在,水库和场尺度描述网格或非结构化网格被转换为动态(通过时间)模拟网格或非结构化网格,随后可用于输入到动态计算器。 盆地建模可以在水库尺度进行,提供当前日期与作用于岩石和流体的历史过程之间的联系。

    Basin-to-Reservoir Modeling
    2.
    发明申请
    Basin-to-Reservoir Modeling 有权
    盆地到水库建模

    公开(公告)号:US20150205001A1

    公开(公告)日:2015-07-23

    申请号:US14368363

    申请日:2013-10-15

    CPC classification number: G01V99/005 G06F17/10 G06T17/05

    Abstract: Systems and methods for basin to reservoir modeling to identify any hi-grade drilling targets based on the linking of static and dynamic reservoir rock and fluid properties. Static, present-day, reservoir and field scale description grids or unstructured meshes are transformed into dynamic (through time) simulation grids or unstructured meshes that can subsequently be used for input to dynamic calculators. Basin modeling may be performed at the reservoir scale, providing a link between present-day and the historical process that acted on the rocks and fluids.

    Abstract translation: 基于静态和动态储层岩石和流体性质的连接的盆地到油藏建模的系统和方法,以识别任何高级钻井目标。 静态,现在,水库和场尺度描述网格或非结构化网格被转换为动态(通过时间)模拟网格或非结构化网格,随后可用于输入到动态计算器。 盆地建模可以在水库尺度进行,提供当前日期与作用于岩石和流体的历史过程之间的联系。

Patent Agency Ranking