-
公开(公告)号:US12031423B2
公开(公告)日:2024-07-09
申请号:US17404446
申请日:2021-08-17
Applicant: Landmark Graphics Corporation
Inventor: Paulo Alves Braz , Roger David Marin Martinez , Gabriel Tirado , Marcelo Gomes de Souza , Damian Martinez , Henrique de Azevedo Araujo , Cristian Fattori
IPC: G06Q10/0639 , E21B44/00 , G06Q50/02
CPC classification number: E21B44/00 , G06Q10/0639 , G06Q50/02 , E21B2200/20 , E21B2200/22
Abstract: A method includes acquiring historical well construction data associated with a set of historical wells. The method also includes developing a well construction model using the corpus of historical well construction data. Additionally, the method includes acquiring real-time well construction data during a well construction operation and applying the well construction model to the real-time well construction data to identify changes to a well construction parameter. Further, the method includes outputting a command to update the well construction operation using the changes to the well construction parameter.
-
公开(公告)号:US20230193725A1
公开(公告)日:2023-06-22
申请号:US17553219
申请日:2021-12-16
Applicant: Landmark Graphics Corporation
Inventor: Margareth Gibbons Parra , Adolfo Gonzales , Nitish Damodar Chaudhari , Gabriel Tirado
CPC classification number: E21B41/00 , G06F30/27 , E21B47/12 , E21B2200/22
Abstract: The disclosure presents processes for evaluating a borehole design against one or more identified risks. The processes can determine borehole design concepts for the borehole design. Each borehole design concept can have multiple risks assigned, which can be selected from a library of risks, a risk matrix or template, a risk model, or user entered risks. The risks can be scored using one or more statistics-based algorithms, such as a sum, an average, a mean, or other algorithms. The risks can be grouped by a risk level, forming a sub-risk score for each risk level for each borehole design concept. A final risk score can be generated using the sub-risk scores for the borehole design. More than one borehole design can be evaluated using a risk tolerance parameter and the borehole design that satisfies the risk tolerance parameter can be selected as the recommended borehole design.
-
公开(公告)号:US20230058683A1
公开(公告)日:2023-02-23
申请号:US17404446
申请日:2021-08-17
Applicant: Landmark Graphics Corporation
Inventor: Paulo Alves Braz , Roger David Marin Martinez , Gabriel Tirado , Marcelo Gomes de Souza , Damian Martinez , Henrique de Azevedo Araujo , Cristian Fattori
Abstract: A method includes acquiring historical well construction data associated with a set of historical wells. The method also includes developing a well construction model using the corpus of historical well construction data. Additionally, the method includes acquiring real-time well construction data during a well construction operation and applying the well construction model to the real-time well construction data to identify changes to a well construction parameter. Further, the method includes outputting a command to update the well construction operation using the changes to the well construction parameter.
-
-