摘要:
Pixels representing attributes of data records are into discrete rings of a graphical visualization, where the discrete rings correspond to respective ones of the attributes, and where the pixels are arranged in each of the discrete rings according to time intervals of the data records. A correlation ring is provided in the graphical visualization in addition to the discrete rings, where the correlation ring has visual indicators for indicating degrees of correlation between at least two of the attributes.
摘要:
A method executed by a system having a processor includes arranging pixels representing attributes into a plurality of rings. Each ring contains pixels representing a time series of attribute values for a respective one of the attributes. The method further includes providing a peak detection ring. The peak detection ring includes visual indicators for indicating a location of at least one peak in an attribute in the plurality of rings.
摘要:
Data points contain data values in respective time intervals. Pixels representing data points for time periods (each time period including multiple time intervals) are placed in corresponding discrete rings in a graphical visualization, wherein the pixels are user accessible to allow viewing of information of the corresponding data points. The pixels are temporally aligned in the corresponding discrete rings, and the pixels in the corresponding discrete rings are variably sized depending on a number of data points in the respective time periods.
摘要:
Data points contain data values in respective time intervals. Pixels representing data points for time periods (each time period including multiple time intervals) are placed in corresponding discrete rings in a graphical visualization, wherein the pixels are user accessible to allow viewing of information of the corresponding data points. The pixels are temporally aligned in the corresponding discrete rings, and the pixels in the corresponding discrete rings are variably sized depending on a number of data points in the respective time periods.
摘要:
In a method for managing a facility that is to receive resources from a first resource supply, a supply of resources available from the first resource supply is predicted for a predetermined period of time. In addition, a demand for resources in the facility during the predetermined period of time is predicted. A capacity schedule for the facility is planned to meet a predefined operational goal, in which the plan of the capacity schedule uses as inputs, the predicted supply of resources available from the first resource supply and the predicted demand for resources in the facility during the predetermined period of time. Moreover, a determination as to whether the planned capacity schedule meets the predefined operational goal is made.
摘要:
In one implementation, an interactive service management system includes a performance profile module and a performance evaluation module. The performance profile modules defines a performance measure of an interactive service based on a quality assessment associated with the interactive service. The performance evaluation module compares the performance measure with performance target associated with the interactive service, and modifies the performance target associated with the interactive service based on the comparison of the performance measure and the performance target.
摘要:
In one implementation, an interactive service management system includes a performance profile module and a performance evaluation module. The performance profile modules defines a performance measure of an interactive service based on a quality assessment associated with the interactive service. The performance evaluation module compares the performance measure with performance target associated with the interactive service, and modifies the performance target associated with the interactive service based on the comparison of the performance measure and the performance target.
摘要:
A method for automated design of an IT infrastructure, includes a) identifying IT equipment to support services to be provided to meet one or more user requirements; b) identifying one or more auxiliary infrastructures to meet requirements of the identified computer equipment; c) synthesizing the IT equipment and the one or more auxiliary infrastructures to generate a candidate design; d) analyzing one or more operating characteristics of the candidate design; e) repeating steps a)-d) on at least one additional candidate design that differs from the candidate design generated at step c); and f) storing at least one of the candidate design and the at least one additional candidate design.
摘要:
In a method for managing energy demand in an infrastructure, a coefficient of performance (COP) of the infrastructure as a function of time is determined. The COP is a measure of efficiency of the infrastructure. In addition, an energy demand on the infrastructure as a function of time is determined and an energy demand schedule for the infrastructure that temporally reallocates the energy demand based upon the determined COP of the infrastructure is determined.
摘要:
In an embodiment, a device characterization system includes a sensor to sense an attribute of a device, a processor, and an algorithm executable on the processor to collect time series data of the attribute from the sensor, detect edges in the data, identify clusters from the edges, label the clusters based on input from a supervisor, and estimate device characterization parameters from the clusters.